Alerts


List of past alerts
Alerts Effective Dates
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-

    Resurface Administration access ramp south side

    Posted:
    Thursday, October 23, 2003 - 1:00 am

    Type:
    Exterior

    Effective:
    -

    Details:
    Resurface ramp between new and old sections of the Administration building, on the path between the buildings on the south (Holloway) side. This ramp and the doors it serves will be closed to all traffic. This project was originally scheduled to begin on October 24.

    Alternate Access:
    ADA access will be via the ramp to the main entrance on Holloway, on the south side of the building.

    For More Information:
    415-338-1864
    dspuhler@sfsu.edu

    Resurface Administration access ramp north side

    Posted:
    Thursday, October 23, 2003 - 1:00 am

    Type:
    Exterior

    Effective:
    -

    Details:
    The ADA access ramp on the north side of the Administration building (quad side) will be resurfaced. The ramp and doors will be closed to all traffic. This project was originally scheduled to begin October 24.

    Alternate Access:
    ADA ramp to the main entrance on the south side of the building on Holloway.

    For More Information:
    415-338-1864
    dspuhler@sfsu.edu

    Resurface Administration access ramp south side

    Posted:
    Thursday, October 23, 2003 - 1:00 am

    Type:
    Exterior

    Effective:


    Details:
    Resurface ramp between new and old sections of the Administration building, on the path between the buildings on the south (Holloway) side. This ramp and the doors it serves will be closed to all traffic.

    Alternate Access:
    ADA access will be via the ramp to the main entrancce on Holloway, on the south side of the building.

    For More Information:
    415-338-1864
    dspuhler@sfsu.edu

    Resurface Administration access ramp north side

    Posted:
    Wednesday, October 22, 2003 - 1:00 am

    Type:
    Exterior

    Effective:


    Details:
    The ADA access ramp on the north side of the Administration building (quad side) will be resurfaced. The ramp and doors will be closed to all traffic.

    Alternate Access:
    ADA ramp to the main entrance on the south side of the building on Holloway.

    For More Information:
    415-338-1864
    dspuhler@sfsu.edu

    Resurface Administration access ramp south side

    Posted:
    Wednesday, October 22, 2003 - 1:00 am

    Type:
    Exterior

    Effective:


    Details:
    Resurface ramp between new and old sections of the Administration building, on the path between the buildings on the south (Holloway) side. This ramp and the doors it serves will be closed to all traffic.

    Alternate Access:
    ADA access will be via the ramp to the main entrance on Holloway, on the south side of the building.

    For More Information:
    415-338-1864
    dspuhler@sfsu.edu

    Humanities Building Access Restricted

    Posted:
    Wednesday, September 10, 2003 - 1:00 am

    Type:
    Exterior

    Effective:
    -

    Details:
    West side entrance closed due to dismantling and removal of courtyard scaffolding.

    Alternate Access:
    Accessbile entrances located at north, south and east sides of building.

    For More Information:
    (415) 338-7242
    dmccormi@sfsu.edu

    Fine Arts Building Access Restricted

    Posted:
    Friday, August 15, 2003 - 1:00 am

    Type:
    Exterior

    Effective:
    -

    Details:
    Building entrances on the south side of the building, 2nd floor plaza level, will be inaccessible due to scaffolding.

    Alternate Access:
    Accessible entrances are located at the south side (1st floor level) and at the east side of the building.

    For More Information:
    (415) 338-7242
    dmccormi@sfsu.edu

    Humanities Building Courtyard Access Restricted

    Posted:
    Friday, August 15, 2003 - 1:00 am

    Type:
    Interior

    Effective:
    -

    Details:
    The center courtyard of the building is closed for repairs.

    Alternate Access:
    There is no alternate access into courtyard. Accessible building entrances and exits are located at the north, south, east and west sides of the building.

    For More Information:
    (415) 338-7242
    dmccormi@sfsu.edu

    Humanities Building Access Restricted

    Posted:
    Friday, August 15, 2003 - 1:00 am

    Type:
    Exterior

    Effective:
    -

    Details:
    West side entrance closed due to overhead construction work on exterior walls.

    Alternate Access:
    Accessible entrances located at north, south, and east sides of building.

    For More Information:
    (415) 338-7242
    dmccormi@sfsu.edu

    Ramp Closed between FA, BH, and Student Center

    Posted:
    Thursday, June 19, 2003 - 1:00 am

    Type:
    Exterior

    Effective:
    -

    Details:
    The ramp between the Fine Arts Building, Burk Hall, and the Student Center will be closed due to its reconstruction, impacting access via the courtyard.

    Alternate Access:
    Use existing, alternate paths of travel around Burk Hall and the Fine Arts Building to reach west side of campus. Alternate access from courtyard area via north-east entrance at Fine Arts (near construction site) or Burk Hall.

    For More Information:
    (415) 405-3812
    jodatian@sfsu.edu

    Fine Arts building elevator

    Posted:
    Friday, May 16, 2003 - 1:00 am

    Type:
    Interior

    Effective:
    -

    Details:
    The elevator in the Fine Arts building has been shut down for emergency repairs. The time required to repair is unknown at this time.

    Alternate Access:
    Floors 1 and 2 two via ramps on the east side of the building. Contact the department in the building that you have business with for access information for floors 3 thru 5.

    For More Information:
    415-405-3628
    mfcurran@sfsu

    Fine Arts Building Access Restricted

    Posted:
    Thursday, May 15, 2003 - 1:00 am

    Type:
    Exterior

    Effective:
    -

    Details:
    Building entrances from the east side (plaza level) will be closed due to scaffolding and construction work on exterior walls of building. Pathway between Fine Arts and Burk Hall wil be intermittently closed to allow movement of materials.

    Alternate Access:
    Accessible entrances are located at the south and east sides (lower level) of the building.

    For More Information:
    (415) 338-7242
    dmccormi@sfsu.edu

    Humanities Building Access Restricted

    Posted:
    Thursday, May 15, 2003 - 1:00 am

    Type:
    Exterior

    Effective:
    -

    Details:
    Building entrances from the west side and the courtyard will be closed due to scaffolding and construction work on exterior walls of the building.

    Alternate Access:
    Accessible entrances are located at the north, south and east sides of the building.

    For More Information:
    (415) 338-87242
    dmccormi@sfsu.edu

    Hensill Hall 7th and 8th Floors Closed

    Posted:
    Thursday, May 15, 2003 - 1:00 am

    Type:
    Interior

    Effective:
    -

    Details:
    Due to this building's seismic retrofit and renovation the main office for the Biology Department has been temporarily relocated to the Franciscan Building (west of the library). Programs have also been relocated. Currently the 7th and 8th floors are closed for renovation.

    Alternate Access:
    For more specific information please contact or visit the Biology Department's main office in the Franciscan Building, or call (415) 338-1548.

    For More Information:
    (415) 338-6476
    gmoyer@sfsu.edu

    Hensill Hall Parking Closed

    Posted:
    Thursday, May 15, 2003 - 1:00 am

    Type:
    Parking

    Effective:
    -

    Details:
    Parking area behind Hensill and Thornton Halls closed for the duration of the project.

    Alternate Access:
    Accessible parking available in Lot 6, north of Gymnasium.

    For More Information:
    (415) 338-6476
    gmoyer@sfsu.edu

    Residence Apartment Building Parking Closed

    Posted:
    Thursday, May 15, 2003 - 1:00 am

    Type:
    Parking

    Effective:
    -

    Details:
    The surface parking lot immediately north of RAB will be closed for the duration of the project.

    Alternate Access:
    Accessible parking is still available along South State Drive and in the main parking garage (Lot 20).

    For More Information:
    (415) 338-6017
    rogerf@sfsu.edu

    Fine Arts Building Access Restricted

    Posted:
    Friday, May 9, 2003 - 1:00 am

    Type:
    Exterior

    Effective:
    -

    Details:
    Building entrances from the east side (plaza level) will be closed due to scaffolding and construction work on exterior walls of building. Pathway between Fine Arts and Creative Arts Buildings will be intermittently closed to allow movement of materials.

    Alternate Access:
    Accessible entrances are located at the south and east sides (lower level) of the building.

    For More Information:
    (415) 338.7242
    dmccormi@sfsu.edu

    Humanities Building Access Restricted

    Posted:
    Tuesday, May 6, 2003 - 1:00 am

    Type:
    Exterior

    Effective:
    -

    Details:
    Buildng entrances from the west side and the courtyard will be closed due to scaffolding and construction work on exterior walls of the building.

    Alternate Access:
    Accessible entrances are located at the north, south, and east sides of the building.

    For More Information:
    87242
    dmccormi@sfsu.edu

    Parking Lot 20 Elevator Out of Service

    Posted:
    Wednesday, April 2, 2003 - 12:00 am

    Type:
    Exterior

    Effective:
    -

    Details:
    Lot 20 Parking Sturcture Elevator is out of service. For assistance, please contact DRC during normal business hours at 338-2472 or Public Safety at 338-7200 (24 hours/day).

    Alternate Access:
    For More Information:
    338-1441
    parking@sfsu.edu

    Lot 20 Parking Garage Elevator Out of Service

    Posted:
    Friday, March 21, 2003 - 12:00 am

    Type:
    Exterior

    Effective:
    -

    Details:
    Lot 20 parking garage elevator will be out of service from March 21, 2003 to March 24, 2003 (Friday-Monday). For assistance, please call DRC at 338-2472 during normal business hours. Public Safety personnel is available at 338-7200 24 hours a day.

    Alternate Access:
    For More Information:
    338-1441

    Cesar Chavez Student Center - Plaza View

    Posted:
    Wednesday, February 26, 2003 - 12:00 am

    Type:
    Interior

    Effective:
    -

    Details:
    Plaza View on the main level of the Cesar Chavez Student Center will be closed of the the public for renovation.

    Alternate Access:
    Entrances on the East, West, South and North Plazas are fully operable.

    For More Information:
    425-338-6441
    edinab@sfsu.edu
    www.sfsustudentcenter.com

    Fine Arts elevator out of service

    Posted:
    Tuesday, February 25, 2003 - 12:00 am

    Type:
    Interior

    Effective:


    Details:
    The Fine Arts elevator will be out of service today, Tuesday 2/25/03. from 8:00AM until 12:00 Noon for emergency repairs to the brake system.

    Alternate Access:
    Access to floors 1 and 2 via ramps on the east side of the building. There is no access to floors 3-5. Please contact the department you have business with for further assistance with access.

    For More Information:
    415-405-3628
    mfcurran@sfsu.edu

    Residence Apartment Building Pathway Closed

    Posted:
    Tuesday, February 18, 2003 - 12:00 am

    Type:
    Exterior

    Effective:
    -

    Details:
    The pathway between Residence Apartment Building and the Village will be closed to pedestrian access until July 15, 2003 due to construction activities.

    Alternate Access:
    Use existing accessible pathways and ramps through the Village located immediately along the north side of the Village's west exterior stair entry.

    For More Information:
    86017
    rogerf@sfsu.edu

    Fine Arts Building Elevator Closed

    Posted:
    Wednesday, February 12, 2003 - 12:00 am

    Type:
    Interior

    Effective:
    -

    Details:
    The elevator in the Fine Arts building is out of service for unplanned repairs. At this time it appears that it will remain out of service until Friday afternoon, 2/14/03.

    Alternate Access:
    This does effect ADA access to the building. There are alternative routes via the ramps on the east side of the building to floors 1 and 2. There are no alternative routes to floors 3-5.

    For More Information:
    415-405-53628
    mfcurran@sfsu.edu

    Ward Park Halls -- Main Entrance Improvements

    Posted:
    Friday, February 7, 2003 - 12:00 am

    Type:
    Exterior

    Effective:
    -

    Details:
    To enhance Residence Halls security, this project replaces the main entrance doors to Park and Ward Halls and modifies the main entrances.

    Alternate Access:
    Entry procedures and paths for the Residence Halls may change for short times during construction. The Contractor will post signs and guide people to an alternate entrance when and if these changes are necessary.

    For More Information:
    415-338-2720
    twill@sfsu.edu