Alerts
Lot 20 elevator shutdown
Posted:
Friday, October 3, 2008 - 1:00 am
Type:
Parking
Effective:
Details:
The Lot 20 elevator has been shut down for emergency repairs. It is anticipated that it will be returned to service by 1:00pm today.
Alternate Access:
Use ADA parking on the roof and then proceed across the walkway as usual to reach the campus.
For More Information:
415-405-3628
mfcurran@sfsu.edu
415-405-3628
mfcurran@sfsu.edu
Psychology building elevator shutdown for emergency repairs
Posted:
Friday, September 26, 2008 - 1:00 am
Type:
Interior
Effective:
-
Details:
The elevator in the Psychology building will be shut down for emergency repairs. It should be returned to service by 4:00pm on Monday, 9/29/2008.
Alternate Access:
There are no alternate elevators in the building
For More Information:
415-405-3628
mfcurran@sfsu.edu
415-405-3628
mfcurran@sfsu.edu
Creative Arts building elevator out of service
Posted:
Wednesday, September 24, 2008 - 1:00 am
Type:
Exterior
Effective:
-
Details:
The elevator in the Creative Arts building in the south-west corner of the building (BECA) is out of service for emergency repairs. It is anticipated that it will be out of service at least until Friday afternoon. I will update you as more information becomes available.
Alternate Access:
For alternate access, please see your department manager.
For More Information:
415-405-3628
mfcurran@sfsu.edu
415-405-3628
mfcurran@sfsu.edu
Campus Quad - Library Construction Fence Re-Alignment
Posted:
Wednesday, September 10, 2008 - 1:00 am
Type:
Exterior
Effective:
-
Details:
The Library construction fence has been re-aligned to close access to the Library ground floor entrance at the west end of the Library. The ground floor may be reached via the Library elevators. Also, the main entrances to the Library have been fenced to allow control of pedestrian access from the east. This configuration is necessary to allow safe passage of construction trucks crossing the pedestrian pathway into the Library. When necessary, access to the Library will be closed off momentarily for the passage of construction vehicles. Lot #3 has also been closed to pedestrian traffic as that area is now a part of the construciton zone. Access to the Administration Buiding exterior elevator is being maintained. Finally, this configuration of the fence will remain until the completion of the west addition to the Library currently schedule for April 6, 2010.
Alternate Access:
Access to the campus from Holloway Avenue is posssible from either the pathway east of Administration Building or the pathway east of Creative Arts.
For More Information:
415-338-1698
build@sfsu.edu
www.sfsu/~build/
415-338-1698
build@sfsu.edu
www.sfsu/~build/
Library Construction Fence Change
Posted:
Wednesday, September 10, 2008 - 1:00 am
Type:
Exterior
Effective:
-
Details:
Due to site utility conditions, the contractor will be extending the westerly side of the Library construction fence north to the Student Union berm, blocking the east-west walkway in the area of the south side of the Student Union. This configuration will be in place for the foreseeable future. Also, as a part of this fence re-configuration, the fenced walkway entry to the Library ground floor is moving approximately 80 feet east.
Alternate Access:
From the northeast end of Creative Arts Building,follow the walkway/Library construction fence north into the Malcolm X Plaza and then easterly to the original walkway at the front of the Library.
For More Information:
415-338-1698
build@sfsu.edu
www.sfsu.edu/~build/
415-338-1698
build@sfsu.edu
www.sfsu.edu/~build/
The Lot 20 parking garage elevator
Posted:
Wednesday, September 10, 2008 - 1:00 am
Type:
Exterior
Effective:
-
Details:
The Lot 20 parking garage elevator will remain out of service through the business day, Wednesday, 9/10/2008, while emergency repairs continue.
Alternate Access:
The alternate to 3rd floor ADA parking is to proceed directly to the roof ADA parking, and use the campus walkway as you usually would.
For More Information:
415-405-3628
mfcurran@sfsu.edu
415-405-3628
mfcurran@sfsu.edu
Temporary Detour at South Quad Walkway, Quad Paving Project
Posted:
Monday, July 28, 2008 - 1:00 am
Type:
Exterior
Effective:
-
Details:
On July 30, 2008 work will begin on a pathway paving project parallel to the existing southerly accessible walkway in front of the Library on the Quad. The existing pathway is required to be closed temporarily until August 15, 2008 when the work is scheduled to be completed . This task is necessary to provide an alternate accessible pathway for the Campus when the Library construction project fence is relocated later this fall.
Alternate Access:
During this 3 week period please detour around this area using either the existing pathway on the north side of the Quad or Holloway Avenue which can be reached via the pathway to the east of Administration Building.
For More Information:
415-338-1698
build@sfsu.edu
www.sfsu.edu/~build/
415-338-1698
build@sfsu.edu
www.sfsu.edu/~build/
Library Construction Fence, West Side, Site Utilities Work
Posted:
Monday, July 28, 2008 - 1:00 am
Type:
Exterior
Effective:
-
Details:
Due to site utilities, a temporary work area is being set up with delineators, barrier tape, and toe rail along the west side of the Library construction fence. The work area is a 20 foot by 20 foot 'push-out' of the fenced construction site and does not block the entire walkway where this work occurs. July 28, 2008 Update: Work is complete and obstructions have been removed.
Alternate Access:
Please follow the delineators and toe rail around this work area.
For More Information:
415-338-1698
build@sfsu.edu
www.sfsu.edu/~build/
415-338-1698
build@sfsu.edu
www.sfsu.edu/~build/
Holloway Avenue at Library - Closed to Pedestrian Traffic
Posted:
Thursday, July 3, 2008 - 1:00 am
Type:
Exterior
Effective:
-
Details:
Monday, July 7, 2008 through Friday, July 11, 2008 (7:00 a.m. to 4:30 p.m.) each day, the sidewalk along the north side of Holloway Avenue from Lot #3 on the east to Creative Arts Building on the west, will be closed to pedestrian traffic due to Library construction activities along the south side of the Library.
Alternate Access:
Either use the sidewalk on the south side of Holloway Avenue as directed by signs and flaggers in this area or use the campus pathways as alternate routes.
For More Information:
415-338-1698
build@sfsu.edu
www.sfsu.edu/~build/
415-338-1698
build@sfsu.edu
www.sfsu.edu/~build/
Lot #3 Closure
Posted:
Wednesday, July 2, 2008 - 1:00 am
Type:
Exterior
Effective:
-
Details:
Lot #3 will be closed to vehicular and pedestrian traffic on July 3,2008 from 7:00 a.m. until 4:00 p.m. due to Library related site clearing work along the east side of the Library.
Alternate Access:
Please use either the sidewalk east of the Administration Building, or the recently installed ramp/walkway on the east side of the Creative Arts Building as accessible alternatives.
For More Information:
415-338-1698
build@sfsu.edu
www.sfsu.edu/~build/
415-338-1698
build@sfsu.edu
www.sfsu.edu/~build/
Psychology Building Elevator Update
Posted:
Friday, June 27, 2008 - 1:00 am
Type:
Interior
Effective:
-
Details:
The elevator shutdown in the Psychology building has been extended at least through July 2, 2008 for emergency repairs.
Alternate Access:
Contact your instructor or department manager if alternate arrangements are required.
For More Information:
415-338-6148
sslai@sfsu.edu
415-338-6148
sslai@sfsu.edu
Psychology building elevator shutdown
Posted:
Wednesday, June 25, 2008 - 1:00 am
Type:
Exterior
Effective:
-
Details:
The elevator in the Psychology building will be shutdown on Thursday, 6/26/2008 at 8:00am until Friday, 6/27/2008 at 10:00am for emergency bearing replacement.
Alternate Access:
For alternate access you will have to contact your department manager
For More Information:
415-405-3628
mfcurran@sfsu.edu
415-405-3628
mfcurran@sfsu.edu
Creative Arts Sidewalk Repairs
Posted:
Monday, June 9, 2008 - 1:00 am
Type:
Exterior
Effective:
-
Details:
The existing sidewalk on the east side of the Creative Arts Building (near the end of the newly installed accessible ramp) will be closed for repairs Tuesday morning June 10, 2008 from 6:30 a.m. until 10:00 a.m.
Alternate Access:
Please use either the sidewalk between Lot #2 and the Administration Building or Tapia Drive for alternate walkways to the campus from Holloway Avenue.
For More Information:
415-338-1698
build@sfsu.edu
415-338-1698
build@sfsu.edu
Winston Drive Stair Closure
Posted:
Thursday, June 5, 2008 - 1:00 am
Type:
Exterior
Effective:
-
Details:
The Winston Drive stairs to the campus across from Parking Lot 25 are closed as of yesterday, April 7, 2008 and will remain closed until August 23, 2008, due to demolition and construction activities at the Lakeview Center site.
Alternate Access:
Winston Drive sidewalk west to Lake Merced Boulevard and south around to North State Drive.
For More Information:
53869
dgill@sfsu.edu
53869
dgill@sfsu.edu
Library Work Start-Up
Posted:
Friday, May 30, 2008 - 1:00 am
Type:
Exterior
Effective:
-
Details:
In reference to the start of operations at the Library, installation of an 8 foot tall construction fence began this morning, May 27, 2008. From now until October 2008, the fencing will remain in this configuration. Screening materials will be added in the next few days. A accessible walkway from Holloway to the Quad is also being installed starting today and will be complete by the end of work tomorrow. This aluminum ramp located immediately along the east side of the Creative Arts Building will provide access throughout the construction period of the west addition.
Alternate Access:
Today and tomorrow, the alternate route is to either use the walkway to the immediate east of the ADM Building or Tapia Drive to gain access to the Quad from Holloway Avenue.
For More Information:
81698
build@sfsu.edu
http://www.sfsu.edu/~build/
81698
build@sfsu.edu
http://www.sfsu.edu/~build/
Automatic Door Repairs at 4th Floor ADM
Posted:
Tuesday, April 8, 2008 - 1:00 am
Type:
Interior
Effective:
-
Details:
The automatic door openers for the Men's and Women's Restrooms on the 4th floor of the Administration Building (west wing) will be out-of-service beginning tonight (4/8/08) and will remain out-of-service for approximately 2 days. As a result, these restrooms will not be accessible.
Alternate Access:
Alternate accessible restroom facilities are located on the 1st, 2nd and 3rd floors.
For More Information:
87242
dmccormi@sfsu.edu
87242
dmccormi@sfsu.edu
Parking Lot 2 Closure
Posted:
Wednesday, March 26, 2008 - 1:00 am
Type:
Exterior
Effective:
-
Details:
Please be advised that the following parking lot will be closed and unavailable for accessible parking due to construction beginning March 24, 2008 and will remain closed until construction is complete on or about March 28, 2008: Parking Lot 2 located on Holloway Avenue at the east side of the Administration Building.
Alternate Access:
Alternate accessible parking is located along Holloway Avenue (on-street), between 19th Avenue and Font Boulevard, and in Parking Lot 6 at the north side of the Gymnasium. Alternate van accessible parking is located in Parking Lot 6.
For More Information:
Dave McCormick
dmccormi@sfsu.edu
Dave McCormick
dmccormi@sfsu.edu
BUS T142 (Women's Restroom)
Posted:
Friday, February 15, 2008 - 12:00 am
Type:
Interior
Effective:
-
Details:
Please be advised that the following restroom will not be accessible due to construction until February 15, 2008: BUS T142 (Women's Restroom) located in the north end of the 1st floor will not be accessible.
Alternate Access:
Alternate accessible restroom facilities are located in BUS T231 (2nd floor).
For More Information:
415-405-3628
mfcurran@sfsu.edu
415-405-3628
mfcurran@sfsu.edu
Library restroom
Posted:
Thursday, January 24, 2008 - 12:00 am
Type:
Interior
Effective:
-
Details:
Library T28 (Women's Restroom) located in the basement of the Library will not be accessible.
Alternate Access:
Alternate restroom facilities are located in Library T131 (1st floor).
For More Information:
415-405-3628
mfcurran@sfsu.edu
415-405-3628
mfcurran@sfsu.edu
HSS restroom
Posted:
Thursday, January 24, 2008 - 12:00 am
Type:
Exterior
Effective:
Details:
HSS T153 (Men's Restroom) located in the north wing of the 1st floor will not be accessible.
Alternate Access:
Alternate restroom facilities are located in HSS T257 (2nd floor).
For More Information:
415-405-3628
mfcurran@sfsu.edu
415-405-3628
mfcurran@sfsu.edu
Administration building restroom
Posted:
Thursday, January 24, 2008 - 12:00 am
Type:
Exterior
Effective:
Details:
ADM 4th floor Women's Restroom (west wing) will not be accessible.
Alternate Access:
Alternate restroom facilities are located on the 1st, 2nd and 3rd floors.
For More Information:
415-405-3628
mfcurran@sfsu.edu
415-405-3628
mfcurran@sfsu.edu
The east elevator in Centennial Village building B is out of service
Posted:
Friday, November 9, 2007 - 12:00 am
Type:
Interior
Effective:
-
Details:
B]>
Alternate Access:
The alternate route to floors 1-3 is to take the main lobby elevator, and then proceed across. For access to floors 4-5-6 and you are unable to use the stairway, please contact the housing office.
For More Information:
415-405-3628
mfcurran@sfsu.edu
415-405-3628
mfcurran@sfsu.edu
ADA accessible pathway between Burk Hall and the Student Health Center is closed
Posted:
Thursday, November 8, 2007 - 12:00 am
Type:
Exterior
Effective:
-
Details:
East-West ADA accessible pathway between the Student Health Center and Burk Hall is closed due to urgent plumbing repairs. The repairs require Facilities to dig up several main building valves and replace them. The construction will be completed on 11/23/2007.
Alternate Access:
Eastbound traffic should go around the south side of Burk Hall. Westbound traffic should proceed across the Student Health Center.
For More Information:
415-405-3628
mfcurran@sfsu.edu
415-405-3628
mfcurran@sfsu.edu
HSS elevator out of service for emergency repairs.
Posted:
Tuesday, April 10, 2007 - 1:00 am
Type:
Interior
Effective:
Details:
The elevator in the HSS building is out of service for emergency repairs. The car will be out of service for most of today. It is not known at this time exactly what the problem is so I will update you this afternoon if it is going to be longer than a one-day outage.
Alternate Access:
Alternate ADA access is as follows: First floor, use main entrance. Second floor use 19th Avenue entrance. Third floor, see your department head.
For More Information:
415-405-3628
mfcurran@sfsu.edu
415-405-3628
mfcurran@sfsu.edu
Campus Pathway improvements- west side Cesar Chavez Center
Posted:
Tuesday, January 9, 2007 - 12:00 am
Type:
Exterior
Effective:
-
Details:
Corrections to ADA pathway deficiencies along the west side of the Student Center from Fine Arts to Burk Hall. All access to the west side pathway will be closed intermittently through out the construciton period. The Garden of Remembrance entries to Burk and Fine Arts are open, but access to the Student Center may be obstructed
Alternate Access:
Visitors are encouraged to use routes on the north side of Burk Hall or the South side of Fine Aets.
For More Information:
415-405-3628
mfcurran@sfsu.edu
415-405-3628
mfcurran@sfsu.edu