Alerts


List of past alerts
Alerts Effective Dates
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-

    Parking Garage, Southeast Elevator

    Posted:
    Wednesday, August 1, 2012 - 1:00 am

    Type:
    Exterior

    Effective:
    -

    Details:
    The garage southeast elevator (near the bridge) will be out of operation on Monday and Tuesday, August 13 & 14, 2012 for the installation of an emergency battery powered lowering device for this elevator.

    Alternate Access:
    The alternative pathway is to use the existing northwest elevator.

    For More Information:
    415-338-1698
    build@sfsu.edu
    www.sfsu.edu/~build

    Creative Arts Building near McKenna Theater

    Posted:
    Wednesday, August 1, 2012 - 1:00 am

    Type:
    Interior

    Effective:
    -

    Details:
    The Creative Arts building elevator serving the 2nd floor administrative area will be out of operation on Wednesday and Thursday August 15 & 16, 2012 for installation of an emergency battery powered lowering device for this elevator.

    Alternate Access:
    There is no alternative pathway for this interruption of service. Please arrange alternative meeting locations if necessary.

    For More Information:
    415-338-1698
    build@sfsu.edu
    www.sfsu.edu~build

    Corporation Yard Elevator

    Posted:
    Wednesday, August 1, 2012 - 1:00 am

    Type:
    Interior

    Effective:
    -

    Details:
    The elevator located in the lobby of the Corporation Yard 2 story building will be out of operation on Tuesday August 28, 2012 for installation of an emergency battery powered lowering device for this elevator.

    Alternate Access:
    There is no alternate access due to this work. If access is required, please plan meeting at a first floor meeting room.

    For More Information:
    415-338-1698
    build@sfsu.edu
    www.sfsu.edu/~build

    Fine Arts Building Elevator Out of Operation

    Posted:
    Wednesday, August 1, 2012 - 1:00 am

    Type:
    Interior

    Effective:
    -

    Details:
    The Fine Arts Building elevator located in the original building serving 2 floors will be out of operation on Monday and Tuesday August 20 & 21, 2012 for installation of an emergency battery powered lowering device for this elevator.

    Alternate Access:
    While no classes are scheduled at this time, an alternative path of travel would be to use the elevator located at the east lobby of Fine Arts.

    For More Information:
    415-338-1698
    build@sfsu.edu
    www.sfsu.edu/~build

    SF Student Center: Information Center Temp .Moved

    Posted:
    Wednesday, July 18, 2012 - 1:00 am

    Type:
    Interior

    Effective:
    -

    Details:
    From July 13th through August 17th, 2012 the plaza level of the student center will be receiving new flooring and a complete remodel of the Information Center.

    Alternate Access:
    A temporary Information Center is located at plaza level dining between Cafe 101 and Taqueria Girasol. Service Impact Clipper service will be unavailable Both Chase ATMs on the plaza level will be out of service The change machine located on the plaza level will be out of service Vendor hours are subject to change Further information may be found at this URL: http://www.sfsustudentcenter.com/renovation/

    For More Information:
    (415) 338-1112
    http://www.sfsustudentcenter.com/renovation/

    Sidewalk Repair, Northside Entrance Humanities Building

    Posted:
    Wednesday, July 11, 2012 - 1:00 am

    Type:
    Exterior

    Effective:
    -

    Details:
    On Wed July 11, sidewalk Repair will be performed along the walkway between Humanities and Centennial Village Building C. The work will portion off half of the running walkway at a time. The walk will remain open however passage will be reduced. The Northern Entrance exit will be blocked off for a brief time approximately two to four hours.

    Alternate Access:
    While the Northern entrance is briefly closed, please use South East or western entrances.

    HSS Re-Roofing Project

    Posted:
    Wednesday, June 27, 2012 - 1:00 am

    Type:
    Exterior

    Effective:
    -

    Details:
    Contractors re-roofing the HSS building have repositioned a debris chute and dump truck on the HSS North Wing west side in order to minimize complaints of noise and dust from occupied faculty offices and classrooms. The new location for the next two (2) months is next to the northwest stairwell. The debris chute and dump truck will interrupt service vehicles from entering on the north side along the asphalt path between Business Building and HSS Building. Pedestrian traffic and accessibility paths remain open around this area. Emergency telephone is accessible. There is yellow caution tape and red flags around this area.

    Alternate Access:
    There are several accessible pathways in this immediate vicinity which remain available.

    For More Information:
    415-338-1698
    build@sfsu.edu
    www.sfsu.edu/~build

    Blocked Entrance: Science Bld. South

    Posted:
    Thursday, May 3, 2012 - 1:00 am

    Type:
    Exterior

    Effective:
    -

    Details:
    The Science Building South entry access was temporarily cordoned off earlier today. This entrance access is now cleared; however additional follow-up work will follow on Friday morning.

    Alternate Access:
    As a practical alternative, please use the northern entrance to the Science Building. The northern entrance is located along the path between Science and Hensill Hall. This path generally conforms to accessibility standards, but there may be excessive cross-slope (over 2%) or other irregularities in a portion of the path, often along the path edge. There is usually a 48" wide complying path along these routes, though it may not be a straight or direct line.

    For More Information:
    405-3628 & 338-2472

    Parking structure Lot 19 and 20, elevator out of service.

    Posted:
    Tuesday, April 17, 2012 - 1:00 am

    Type:
    Exterior

    Effective:
    -

    Details:
    The elevator nearest the bridge to and from parking Structure Lot 19 and 20 and the campus is currently out of service. Operational date will be posted.

    Alternate Access:
    The elevator nearest Capital Planning and the Corporation Yard is operational. Alternate Blue Zone parking may be found on the 5th level.

    For More Information:
    338-1568 or 338-2472

    Library elevator service: First and Ground floor access

    Posted:
    Tuesday, March 27, 2012 - 1:00 am

    Type:
    Interior

    Effective:
    -

    Details:
    The elevators located at the east end of the building adjacent the 24 hour Research Commons, serve floors 1 - 4. Elevator service to and from the first floor to the ground floor is available at the West-end elevator, adjacent the first to ground floor stairway. The library is currently working with elevator technicians to ensure that elevators at the east end operate to and from the correct floors.

    Alternate Access:
    Elevator service to and from the first floor to the ground floor is available at the West end elevator. This is the single elevator located at the west end of the building near the stairway to and from the first and ground floors.

    For More Information:
    338-2472

    Pathway Work Between Hensill Hall and Science and Lot #20 at Bridge

    Posted:
    Sunday, March 18, 2012 - 1:00 am

    Type:
    Exterior

    Effective:
    -

    Details:
    During the week of March 19, 2012 (March 19th through March 23rd), the pathway between Science and Hensill Hall, and between the Science elevator and the quad will be the site of work making paving improvement. Landscaping work will also be done at the bridge entry to campus from Lot 20. Accessible routes are open with occasional momentary closures for equipment movement, and flagpersons will assist pedestrians. Notice of detours and warnings will be posted to advise the public if necessary. Please be cautious in the area.

    Alternate Access:
    As noted above, accessible routes will be open with only occasional interuptions. If detours become necessary, warnings to detours will be posted.

    For More Information:
    415-338-1698
    build@sfsu.edu
    www.sfsu.edu/~build

    Pathway Repairs between Fine Arts and Humanities

    Posted:
    Friday, March 16, 2012 - 1:00 am

    Type:
    Exterior

    Effective:
    -

    Details:
    The pathway between Fine Arts and the Humanities Building will be closed and subject to construction noise, dust and traffic due to the paving improvements being performed. Notice of detours and warnings will be posted to advise the public. Please avoid the area and use the pathways through the Quad as an alternative when accessing the campus from Tapia Drive or the Parking Garage.

    Alternate Access:
    Those needing to enter the inner-campus from the dormitories or Village should use the pathway on the north side of the Village and continue onto the pathway between Burk Hall and the Student Health Center, which will lead into the Quad.

    For More Information:
    415-338-1698
    build@sfsu.edu
    www.sfsu.edu/~build

    Paving Repairs on Holloway Sidewalk at Lot #3

    Posted:
    Friday, March 16, 2012 - 1:00 am

    Type:
    Exterior

    Effective:
    -

    Details:
    During the week of March 19, 2012 (March 19th through March 23rd), portions of the sidewalk on the north side of Holloway Avenue, between the Library and Administration Building will be closed and the adjacent area subject to construction noise, dust and traffic due to the installation of concrete bases for site lighting poles. Notice of detours and warnings will be posted to advise the public. Please avoid the area and use the pathways through the Quad as an alternative route.

    Alternate Access:
    To access the Quad from Holloway Avenue, use the pathway on the west side of the Library or the pathway on the east side of the Administration Building.

    For More Information:
    415-338-1698
    build@sfsu.edu
    www.sfsu.edu/~build

    Parking Lot 2: Temporary Closure

    Posted:
    Thursday, March 8, 2012 - 12:00 am

    Type:
    Exterior

    Effective:
    -

    Details:
    Beginning March 19 through March 23 Parking Lot 2, adjacent the Administration Building, will be closed while the driveway entry apron undergoes repair.

    Alternate Access:
    Six Blue Zone Parking spaces may be found along Holloway.

    For More Information:
    338-1441, 338-2712

    Lot #3, Driveway Work this Weekend-Delayed

    Posted:
    Monday, March 5, 2012 - 12:00 am

    Type:
    Exterior

    Effective:
    -

    Details:
    Note: Work did not occur over the weekend and is underway this a.m., Monday, March 5, 2012 with completion, clean-up, and removal of barricades by end of week. On Saturday, March 3, 2012 and Sunday, March 4, 2012, the sidewalk on the north side of Holloway Avenue, between the Library and Administration Building will be closed and the adjacent area subject to construction noise, dust and traffic due to the paving improvements being performed. Notice of detours and warnings will be posted to advise the public. Please avoid the area and use the pathways through the Quad as an alternative route. This work is necessary to provide a new driveway for Lot #3.

    Alternate Access:
    To access the Quad from Holloway Avenue, use the pathway on the west side of the Library or the pathway on the east side of the Administration Building.

    For More Information:
    415-338-1698
    build@sfsu.edu
    www.sfsu.edu/~build

    295 Buckingham Way, Elevator Shutdown

    Posted:
    Friday, March 2, 2012 - 12:00 am

    Type:
    Interior

    Effective:
    -

    Details:
    The elevator at 295 Buckingham Way has been temporarily closed for modernization and machinery upgrades. This work will last approximately 8 weeks.

    Alternate Access:
    During this period, the elevator at 285 Buckingham Way will remain in service. Residents at 295 who need to use this elevator will need to cross over the breezeway to do so.

    For More Information:
    415-338-1698
    build@sfsu.edu
    www.sfsu.edu/~build

    Parking Garage Southeast Elevator Closure

    Posted:
    Wednesday, February 22, 2012 - 12:00 am

    Type:
    Exterior

    Effective:
    -

    Details:
    Starting the morning of Friday, February 24, 2012 and continuing through Tuesday, March 2, 2012, the elevator at the southeast corner of the parking garage will be shut down for hoistway frame painting.

    Alternate Access:
    The new elevator at the northwest corner is operational and available for those who require elevator service within the garage and to the 5th level pedestrian bridge.

    For More Information:
    415-338-1698
    build@sfsu.edu
    www.sfsu.edu/~build

    Parking Structure 20 North West Elevator In Service

    Posted:
    Wednesday, February 15, 2012 - 12:00 am

    Type:
    Exterior

    Effective:
    -

    Details:
    The NEW Elevator at the North West corner of parking structure 20 &19 is operational. This elevator is the one closest to: North State Drive,the Children's Campus, Temporary Library Annex 1 and 2, UPD, Capital Planning, Mail Services, the Offices of Procurement. Thank you to all who worked on and helped make this happen.

    Alternate Access:
    This is a news alert recognizing added accessible features to campus.

    Elevator Parking Lot structure 20 and 19: Service down

    Posted:
    Monday, February 13, 2012 - 12:00 am

    Type:
    Exterior

    Effective:
    -

    Details:
    Elevator service will be temporarily disabled while systems review and maintenance is being performed. Service could be returned as early as tomorrow, however; service may be down through until Wednesday Feb. 15.

    Alternate Access:
    Individuals requiring assistance in getting to campus from Lot 20 between the hours of 8am and 4pm should contact the DPRC at 338-2472 After hours please contact University Police at 415-338-7200 for assistance

    For More Information:
    388.2472, UPD 8.7200

    Parking structure 20 and 19: PM Elevator Service

    Posted:
    Thursday, February 9, 2012 - 12:00 am

    Type:
    Exterior

    Effective:
    -

    Details:
    From 9 pm through 7 am on Feb. 9th Thursday, and Friday the 10, elevator service within the parking structure will not be available. Late night elevator service for this parking structure will also be disrupted on Wednesday the 15, Thursday the 16, and Friday the 17. Please be aware, service disruption on these dates will be contained to the overnight hours of 9 pm until 7 am. Elevator service will be available from 7 Am through 9 Pm throughout the period while the glazed encasement is replaced.

    Alternate Access:
    Individuals requiring assistance in getting to campus from Lot 20 from the hours of 9 pm through 7am during these dates are urged to call University Police at 415-338-7200 for assistance

    For More Information:
    338-7200, 338-82472

    Holloway Avenue Sidewalk Work

    Posted:
    Thursday, January 26, 2012 - 12:00 am

    Type:
    Exterior

    Effective:
    -

    Details:
    AT&T will be performing underground utility work at the north sidewalk along Holloway Avenue during the period of Saturday, January 28, 2012 through the end of April, 2012. Work will be occurring on weekends between the hours of 8:00am and 7:00pm and intermittently on weekdays from 8:00am and 5:00pm.

    Alternate Access:
    A pedestrian detour around areas of sidewalk where work occurs will be in place.

    For More Information:
    415-338-1698
    build@sfsu.edu
    www.sfsu.edu/~build

    Burke Hall Elevator, Out of Service: 1st through 5th floors

    Posted:
    Tuesday, January 3, 2012 - 12:00 am

    Type:
    Interior

    Effective:
    -

    Details:
    Burke Hall C wing elevators are undergoing maintenance. Elevator service from this location to floors one through five will be interrupted during today's maintenance.

    Alternate Access:
    Elevator service for floors: Basement, 1, 2, 3, is operational. This elevator is located at the end of the westward hall; signage is in place. If you are unable to navigate the stairway from the third floor too floors four and five, please contact those whom you may have an appointment and arrange for an alternative meeting place.

    For More Information:
    405-3628

    Paving at Centennial Walk

    Posted:
    Thursday, December 15, 2011 - 12:00 am

    Type:
    Exterior

    Effective:
    -

    Details:
    Starting December 20, 2011 and extending through mid-January 2012, the pathway between Burk Hall, Fine Arts, the Humanities Building and the Student Services Building will be partially closed and subject to construction noise, dust and traffic due to the paving improvements being performed. Notice of detours and warnings will be posted to advise the public. Please avoid the area and use the pathways through the Quad as an alternative when accessing the campus from Tapia Drive or the Parking Garage. Those needing to enter the inner-campus from the dormitories or Village should use the pathway on the north side of the Village and continue onto the pathway between Burk Hall and the Student Health Center, which will lead into the Quad. On-campus shuttle service will be unable to pick-up or drop-off riders at the east entrance of the Humanities Building. On-campus shuttle service riders will be picked-up and dropped-off at the west entrance of the building only during this period. Also impacted will be the pathway on the north side of the Humanities Building. The pathway leading from the north entrance of the Humanities Building and heading towards Cafe Rosso will be closed to pedestrian traffic. Those needing to enter the inner- campus from the Humanities Building should use the east exit of the building (facing the Creative Arts Building). Those needing to go to or from the dormitories or Village should use the pathway which runs between the Student Services Building and Building C of the Village.

    Alternate Access:
    See above description of work.

    For More Information:
    415-338-1698
    build@sfsu.edu
    www.sfsu.edu/~build

    Elevator S.W Old Admin: Ground Floor

    Posted:
    Friday, December 2, 2011 - 12:00 am

    Type:
    Exterior

    Effective:
    -

    Details:
    The elevator on the south-west corner of the Old Administration Building was taken out-of-service this week in order to complete the improvements and re-paving of Lot 3 (between the Library and Old ADM). This has impacted access to the ground floor of Old ADM for those who are unable to use the stairs.

    Alternate Access:
    If Staff experience difficulty navigating stairs they should contact their Supervisors. Students an Public who may have appointments with Staff on the ground floor are directed arrange with Staff for alternative meeting place.

    For More Information:
    82472 87242

    December Holiday Electrical Checks

    Posted:
    Friday, November 18, 2011 - 12:00 am

    Type:
    Interior

    Effective:
    -

    Details:
    Below is a schedule episodic shutdowns that will be performed during Christmas Holiday. Closures scheduled during these times aim to lessen the impact on the campus community. Dec. 26: 7am- 11am, Gym 11am-3:30pm, Hensill Hall Dec. 27: 7am- 11am, Administration 11am-3:30pm, Thorton Hall & TH Trailers Dec. 28: 7am- 11am,Creative Arts 11am-3:30pmScience Dec 30: 7am- 11am,Fine Arts 11am-3:30pm, Burke Hall Though not anticipated, these schedules are subject to change. The shutdowns include a variety of tests, which include exercising panel breakers, testing emergency lights and exit signs, as well as briefly testing the audible fire alarms in those buildings. All procedures attempt to assure the reliability of our life safety equipment.

    Alternate Access:
    For More Information:
    338-1568