Alerts


List of past alerts
Alerts Effective Dates
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-

    Creative Arts Entrance/ Exit Door Replacement near bridge to Fine Arts

    Posted:
    Tuesday, October 5, 2010 - 1:00 am

    Type:
    Exterior

    Effective:
    -

    Details:
    October 6 Wednesday: Electronic automatic door activators will be disconected. October 7 Removal of doors at Creative Arts DOOR NEAR BRIDGE TO FA - NOTE: Removal of door Thurs, Oct 7 - starts 6:00 am The contractor stated the noisy work can be done before 9:00 am Signs on vestibule glass doors - keep doors closed - will be posted Once the doors are removed, the contractors must work until the opening is secured. The majority of the removal and replacement work will be completed Oct 7 & 8. However, Automatic door operator final completion will be the week of October 15-19 and, Card key system work will probably be completed the week of October 25-29. Signage will be posted so everyone uses the doors near the Little Theater.

    Alternate Access:
    Signage will be posted so everyone uses the doors near the Little Theater.

    For More Information:
    338.7089

    Gymnasium door to room 149

    Posted:
    Wednesday, September 29, 2010 - 1:00 am

    Type:
    Interior

    Effective:
    -

    Details:
    Gymnasium interior door to Room 149 will undergo threshold repairs. This is not a public entrance. Alternative access can be arranged with Gymnasium Management Staff.

    Alternate Access:
    Alternative access can be arranged with Gymnasium Management Staff.

    For More Information:
    338.7089
    syuki@sfsu.edu

    Administration Building at Parking Lot 2 Door Replacement

    Posted:
    Wednesday, September 29, 2010 - 1:00 am

    Type:
    Exterior

    Effective:
    -

    Details:
    Administration Building entrance exit doors from and to Parking lot number two will undergo replacement and repair. Alternative access can be found at the main entrance.

    Alternate Access:
    Alternative access can be found at the main entrance across from the Health and Human Services Building.

    For More Information:
    338-7089
    syuki@sfsu.edu

    SSB Entrance Exit Door Repair and Replacement

    Posted:
    Wednesday, September 29, 2010 - 1:00 am

    Type:
    Exterior

    Effective:
    -

    Details:
    Student Services Building entrance doors continue to undergo replacement and repair. Entrance / exit doors will be propped open while automatic door controls are being upgraded.

    Alternate Access:
    Entrance / exit doors will be propped open while automatic door controls are being upgraded.

    For More Information:
    338-7089
    syuki@sfsu.edu

    Creative Arts Center Underground Utilities Extension Project

    Posted:
    Wednesday, September 22, 2010 - 1:00 am

    Type:
    Exterior

    Effective:
    -

    Details:
    The Utilities Extension Project encompasses several activities all of which will affect campus pathways during the project. The following is asummary of the affected routes and alternate routes. SFSU-CPDC will update this alert with more detailed information as the contractors schedule is developed and the information becomes available. Font Blvd.: Starting in late September 2010 through mid-November 2010, there will be localized disruptions starting along the north side of the street and later on the south side. Contractors will either provide temporary alternate pedestrian pathways at these locations or direct pedestrians to the unaffected side of the street. Tapia Dr.: From the School of the Arts (SoTA) property east along the Humanities Bldg, the sidewalk along the north side of the street will be closed to pedestrians and there will be no parking from mid- October 2010 through early January 2011. Alternate pedestrian route is the south side of the street. Also, access to the south entrances to Humanities will be closed during this time. Alternate access to the building is the east (main) entrance to Humanities. Pathway between Village and SoTA: This pathway will be closed to pedestrians from early December 2010 through mid-May 2011 - vehicular access to the Village parking garage will remain available. The alternate pedestrian pathways are either through the Village or along the north side of the Village. Centennial Walk: During the Winter Break, this area will be closed to pedestrians from Tapia Dr to the Student Services Bldg. Alternate accessible pedestrian pathways are located either to the north (between Student Health Center and Burk Hall) or to the south along Holloway Ave. Lake Merced Blvd.: From Mid-December through January 2011, there will be work affecting the sidewalk on the east side of the street at the southwest corner of the campus property. Localized alternate pedestrian pathway will be provided. Vehicular traffic will be affected in this area.

    Alternate Access:
    As noted above.

    For More Information:
    415-338-1698
    build@sfsu.edu
    www.sfsu.edu/~build

    Creative Arts Center Utilities Extension Project

    Posted:
    Wednesday, September 22, 2010 - 1:00 am

    Type:
    Exterior

    Effective:
    -

    Details:
    The Utilities Extension Project encompasses several activities many of which will affect campus pathways during the project. The following is a summary of the affected routes and available alternate routes. SFSU-CPDC will update this alert with more detailed information as the contractors schedule is developed and the information becomes available. Font Blvd.: Starting in late September 2010 through mid-November 2010, there will be localized disruptions starting along the north side of the street and later on the south side. Contractors will either provide temporary alternate pedestrian pathways at these locations or direct pedestrians to the unaffected side of the street. Tapia Dr.: From the School of the Arts (SoTA) property east along the Humanities Bldg, the sidewalk along the north side of the street will be closed to pedestrians and there will be no parking from mid- October 2010 through early January 2011. Alternate pedestrian route is the south side of the street. Also, access to the south entrances to Humanities will be closed during this time. Alternate access to the building is the east (main) entrance to Humanities. Pathway between Village and SoTA: This pathway will be closed to pedestrians from early December 2010 through mid-May 2011 - vehicular access to the Village parking garage will remain available. The alternate pedestrian pathways are either through the Village or along the north side of the Village. Centennial Walk: During the Winter Break, this area will be closed to pedestrians from Tapia Dr to the Student Services Bldg. Alternate accessible pedestrian pathways are located either to the north (between Student Health Center and Burk Hall) or to the south along Holloway Ave. Lake Merced Blvd.: From Mid-December through January 2011, there will be work affecting the sidewalk on the east side of the street at the southwest corner of the campus property. Localized alternate pedestrian pathway will be provided. Vehicular traffic will be affected in this area.

    Alternate Access:
    As Noted Above

    For More Information:
    415-338-1698
    build@sfsu.edu
    www.sfsu.edu/~build

    Student Services Building Entrance Door Replacements

    Posted:
    Monday, September 20, 2010 - 1:00 am

    Type:
    Exterior

    Effective:
    -

    Details:
    Replacement of entry doors to the Student Services Building will begin on Monday, September 20 and continue throughout the week until Friday September 24. Alternate doors for access to the building will always be available. Basic signage will be posted to show locations of alternate doors. Be aware of caution tape and cones that will be used to block off the areas that are under repair or replacement.

    Alternate Access:
    Alternate doors for access to the building will always be available. Basic signage will be posted to show locations of alternate doors.

    For More Information:
    415.338.7089
    syuki@sfsu.edu

    Parking Garage (Lot 19/20) Elevator Out of Service - Updated

    Posted:
    Thursday, August 5, 2010 - 1:00 am

    Type:
    Exterior

    Effective:
    -

    Details:
    Please be advised that the Parking Garage (Lot 19/20) elevator will be out-of-service starting on Tuesday, July 27, 2010 to replace the elevator cab. Replacement work is scheduled to be complete on August 15, 2010. The elevator will be out-of-service throughout this period. August 5, 2010 Update: Completion date has been changed to August 18, 2010.

    Alternate Access:
    Vehicles with valid disabled placards may park on the top level of the Parking Garage. Spaces designated for disabled parking are located on the south end of the garage adjacent to the bridge.

    For More Information:
    415-338-1698
    build@sfsu.edu
    www.sfsu.edu/~build

    Walkway closed - 19th Ave. along Hensill Hall to Thorton Hall

    Posted:
    Thursday, August 5, 2010 - 1:00 am

    Type:
    Exterior

    Effective:


    Details:
    The walkway from 19th Avenue along Hensill Hall to Thorton Hall will be closed for tree trimming on Friday, August 6th.

    Alternate Access:
    An alternate route for the is path is to enter Hensill Hall at the 3rd floor along 19th Ave. and exit on the 2nd floor.

    For More Information:
    (415) 338-2712

    Fine Arts / Creative Arts Plaza Closed 7/17/10 --6:00 AM to 10:00 AM

    Posted:
    Friday, July 16, 2010 - 1:00 am

    Type:
    Exterior

    Effective:
    -

    Details:
    Early on the morning of Saturday, July 17, 2010 HVAC equipment replacement on the roof of the Fine Arts Building will necessitate construction crane activity at the Fine Arts / Creative Arts Plaza. For safety reasons, the plaza as well as floors 1 through 5 of Fine Arts building addition will be closed to the public. This closure is planned to last from 6:00 AM to 10:00 AM. There will be NO accessible path into the following areas: 1. Fine Arts / Creative Arts plaza for safety reasons. 2. Fine Arts Building on the south side east of the pedestrian stair bridge. 3. Creative Arts Building on the north side. 4. Student Union dining area on the south west side facing Fine Arts Building.

    Alternate Access:
    ]>

    For More Information:
    415-338-1698
    build@sfsu.edu
    www.sfsu.edu/~build

    Elevator Shutdown - Ethnic Studies Psychology Building

    Posted:
    Tuesday, July 6, 2010 - 1:00 am

    Type:
    Interior

    Effective:


    Details:
    On Wednesday , July 7, 2010 there is a scheduled shutdown of the Ethnic Studies Psychology elevator for maintenance & inspections. This will occur from 8:00 am until noon.

    Alternate Access:
    For More Information:
    x81568

    Toilet Room Renovation - Cesar Chavez Student Center

    Posted:
    Tuesday, June 29, 2010 - 1:00 am

    Type:
    Interior

    Effective:
    -

    Details:
    The Men's restroom on the Lower Conference Level of the Cesar Chavez Student Center will be renovated this summer. Construction is scheduled to begin on Wednesday, June 30, 2010. The restroom will be closed for approximately 3 months while construction is taking place.

    Alternate Access:
    Alternate restroom facilities available within the building are located on the Plaza Level (adjacent to Cafe 101) and on the Terrace Level.

    For More Information:
    8.7242
    dmccormi@sfsu.edu

    Burk Hall - Elevator out of service

    Posted:
    Wednesday, March 10, 2010 - 12:00 am

    Type:
    Interior

    Effective:
    -

    Details:
    One of the two elevators located near the main entrance of Burk Hall will be out of service for preventative maintenance from 3/10/10 - 3/13/10.

    Alternate Access:
    Use second elevator

    For More Information:
    81568

    Library Project Temporary Construction Fence Re-Alignment

    Posted:
    Wednesday, August 12, 2009 - 1:00 am

    Type:
    Exterior

    Effective:
    -

    Details:
    A portion of the west side of the Library construction fence will be reconfigured westerly to allow work on underground sewer pipes to take place. The fence will be moved before 8:00 a.m. on August 13, 2009 and is planned to be restored to its original configuration by Monday August 17, 2009.

    Alternate Access:
    While this work will not block the existing accessible route, it will temporarily narrow the walkway in this area.

    For More Information:
    415-338-1698
    build@sfsu.edu
    www.sfsu.edu/~build

    JULY 28, 2009 POWER SHUT-DOWN AT HH, TH, SCI, ADM, SHC, CCSC, AND TTCS

    Posted:
    Friday, July 17, 2009 - 1:00 am

    Type:
    Interior

    Effective:
    -

    Details:
    On Tuesday, July 28, 2009 from 12:01 a.m. to 6:00 a.m. electrical power will be turned off at the following buildings: Hensill Hall Thornton Hall Science Administration Student Health Center Cesar Chavez Student Center The Towers at Centennial Square This work is necessary to re-route the 12KV electrical power serving the Library.

    Alternate Access:
    As the work is occuring during hours when the buildings are closed, there is no alternative access related to this alert.

    For More Information:
    415-338-2960
    build@sfsu.edu
    http://www.sfsu.edu/~build/

    Fine Arts elevator out of service

    Posted:
    Monday, July 6, 2009 - 1:00 am

    Type:
    Exterior

    Effective:
    -

    Details:
    The Fine Arts building elevator will be shutdown today for emergency repairs. The repairs will take at least until the end of business on Wednesday, 7/8/2009. If the elevator cannot be placed back in service by 5:00 pm on that date I will update this notice.

    Alternate Access:
    ADA access to both the 1st and 2nd floors is via ramps on the east side of the building. For access to floors 3-5, please contact your department.

    For More Information:
    415-405-3628
    mfcurran@sfsu.edu

    CCSC AMPHITHEATER WORK - UPDATE

    Posted:
    Tuesday, June 30, 2009 - 1:00 am

    Type:
    Exterior

    Effective:
    -

    Details:
    Please be advised that the pathway on the east side of the Cesar Chavez Student Center has been reduced in width and the pathway leading into the east plaza from the north has been closed-off due to the installation of a construction fence. These conditions will remain through September 25, 2009.

    Alternate Access:
    Alternate pathways on the east side of the Student Center are available from the east plaza to the south then east and north through the Quad, or one may exit the Student Center through the west plaza to connect to the campus' main east-west pathway.

    For More Information:
    415-338-1698
    build@sfsu.edu
    http://www.sfsu.edu/~build/

    The elevator in Lot 20, the Parking Garage has been shut down

    Posted:
    Thursday, June 18, 2009 - 1:00 am

    Type:
    Exterior

    Effective:


    Details:
    The elevator in Lot 20, the Parking Garage has been shut down for emergency repairs. The elevator will be shutdown from now 11:00 am, Thursday, 6/18/2009 until approximately 2:00 pm this afternoon.

    Alternate Access:
    For alternate parking please proceed to the roof level and use ADA parking. You can then proceed across the walkway to the main campus.

    For More Information:
    415-405-3628
    mfcurran@sfsu.edu

    CCSC AMPHITHEATER WORK

    Posted:
    Thursday, June 11, 2009 - 1:00 am

    Type:
    Exterior

    Effective:
    -

    Details:
    Please be advised that the Cesar Chavez Student Center's north pyramid outdoor amphitheater will be closed due to construction through August 24, 2009.

    Alternate Access:
    Alternate outdoor seating is available in areas surrounding the ground level of the Student Center, including the west and east plazas. Additional seating is available within the Student Center.

    For More Information:
    415-338-1698
    build@sfsu.edu
    http://www.sfsu.edu/~build/

    Student Services building elevators shutdown

    Posted:
    Friday, May 29, 2009 - 1:00 am

    Type:
    Interior

    Effective:


    Details:
    The elevators in the Student Services building will be shutdown on Monday, 6/1/2009 from 7:00 am. They will be out of service for up to 6 hours for removal of an oil tank. It will be necessary to repeat this later this week to re-install the tank.

    Alternate Access:
    For alternate access or accommodation please see your department manager.

    For More Information:
    415-405-3628
    mfcurran@sfsu.edu

    Parking along Holloway Avenue at Library Not Available on May 29, 2009

    Posted:
    Wednesday, May 20, 2009 - 1:00 am

    Type:
    Exterior

    Effective:
    -

    Details:
    Due to a large concrete pour at the Library project, the three designated disabled parking places immediately west of the driveway between the Administration Building and the Library will be unavailable from 5:00 a.m. until 5:00 p.m. on May 29, 2009. Traffic interference caused by these concrete redi-mix trucks during earlier concrete pours has necessitated this action.

    Alternate Access:
    Accessible parking places are available along Holloway Avenue east of this area near Holloway Avenue as well as in lot #2.

    For More Information:
    415-338-1698
    build@sfsu.edu
    http://www.sfsu.edu/~build/

    Path and road maintenance

    Posted:
    Monday, March 23, 2009 - 1:00 am

    Type:
    Exterior

    Effective:
    -

    Details:
    Repairs will be intermittent through spring break and will require intermittent closure of paths and roads in these locations: 1)The road up from Lot 20 to 5 corners 2)The Center of the Quad 3)Stadium drive near lot 6 garage 4)Garden of Remembrance between Burk hall and Fine Art 5)The paved waste collection area west side of Burk Hall 6)Courtyard between Science and Business.

    Alternate Access:
    Information to be provided locally, at the site of the construction work.

    For More Information:
    415-405-3628
    mfcurran@sfsu.edu

    Library Project: Major Concrete Pour

    Posted:
    Thursday, November 13, 2008 - 12:00 am

    Type:
    Exterior

    Effective:
    -

    Details:
    ]>

    Alternate Access:
    The sidewalk along the south side of Holloway Avenue between Cardenas Avenue on the east and Arellano Avenue on the west is an alternate accessible pathway.

    For More Information:
    415-338-1698
    build@sfsu.edu
    www.sfsu.edu/~build/

    Lot 20 Parking Garage elevator out of service.

    Posted:
    Monday, November 10, 2008 - 12:00 am

    Type:
    Parking

    Effective:
    -

    Details:
    The elevator in Lot 20, the Parking Garage has been shut down for emergency repairs. The repairs are expected to take until 5:00pm on Wednesday, 11/12/2008. The elevator will be out of service for the duration of the repair time.

    Alternate Access:
    For alternate parking please proceed to the roof level and use ADA parking. You can then proceed across the walkway to the main campus.

    For More Information:
    415-405-3628
    mfcurran@sfsu.edu

    Creative Arts building elevator out of service

    Posted:
    Wednesday, November 5, 2008 - 12:00 am

    Type:
    Interior

    Effective:
    -

    Details:
    The elevator in the Creative Arts building near the BECA department has been shut down for emergency repairs. The repairs could be extensive and take over two months to complete. The elevator will be out of service for the duration of the repair time.

    Alternate Access:
    For alternate indoor transportation routes or accommodation please check with your department office.

    For More Information:
    415-405-3628
    mfcurran@sfsu.edu