Alerts
Burk Hall: elevator C is operational
Posted:
Tuesday, December 17, 2013 - 12:00 am
Type:
Exterior
Effective:
-
Details:
Dec. 17. Old Burk Hall, C-Wing Elevator floors 1-3 is operational.
Alternate Access:
For More Information:
338-1568, 338-2472
338-1568, 338-2472
ADA Toilet room: 5th floor Library
Posted:
Wednesday, December 11, 2013 - 12:00 am
Type:
Interior
Effective:
-
Details:
12/10/2013 forward. Pardon the inconvenience. The ADA toilet room on the fifth floor of library is out of order. Notice of operation will be posted.
Alternate Access:
All other ADA Toilet Rooms, on all other floors are operational. Toilets are located directly across from the main bank of elevators.
Elevators Out of Service: Parking Garage 19 and 20
Posted:
Tuesday, December 10, 2013 - 12:00 am
Type:
Parking
Effective:
Details:
December 10, 2013. Parking Garage elevators are out of service. Expected time of power restoration is unknown at this time.
Alternate Access:
Handicapped/blue zone parking is available for Staff and Faculty on upper level. Public handicapped/blue zone parking with shuttle service is available at the entrance level and by contacting the Disability Programs Resource Center phone,338-2472 and/or after hours University Police at 338-7200.
For More Information:
338-1441 338-2472
parking@sfsu.edu
338-1441 338-2472
parking@sfsu.edu
Elevators Out of Service: Parking Garage 19 and 20
Posted:
Tuesday, December 10, 2013 - 12:00 am
Type:
Exterior
Effective:
-
Details:
December 10, 2013. Parking Garage elevators are out of service. Expected time of power restoration is unknown at this time; updates will be made available.
Alternate Access:
Handicapped/blue zone parking is available for Staff and Faculty on upper level. Public handicapped/blue zone parking with shuttle service is available at the entrance level and by contacting the Disability Programs Resource Center phone, 338-2472 and/or after hours University Police at 338-7200.
For More Information:
338-2472, 338-7200
338-2472, 338-7200
Spot Repaving of Walkways
Posted:
Thursday, November 21, 2013 - 12:00 am
Type:
Exterior
Effective:
-
Details:
November 21 2013. Be aware, six locations throughout the campus will undergo repaving repairs to walkways. There will be occasional noise from machinery, and some temporary minor detours. Work begins today with the bulk occurring tomorrow, and M-W next week. Access to all buildings will be preserved, where detours are needed workers will be present to assist. Please note the following six locations: Centennial Walk- gate arm entry zone, patching by Burk Hall, and the curb-line and stairwell landing area of HUM. GYM front patio- stair replacement and patio repair. TH loading dock- service road will be closed M, and repaved with one lane kept open Tues. and Wed. of next week. SCI- stairwell leading from Quad to SCI 101. Ethnic Studies- repair near the front entry. Dining Center Loading dock Truck entry and access to that segment of Lot 19. Cox Roadway Mon.-Wend. during the closure. Road will be closed as planned regardless of whether the other project still requires it.
Alternate Access:
Access to buildings may be slowed as work is being done and people entering and leaving the buildings or areas pause to accommodate the work and equipment. Access to and from buildings will be preserved.
For More Information:
338-1568, 338-2472
338-1568, 338-2472
Village Building B: back in service
Posted:
Thursday, November 7, 2013 - 12:00 am
Type:
Interior
Effective:
-
Details:
Thursday Nov. 7, Village B Elevator is back in service.
Alternate Access:
295 Buckingham Elevator: Out of Service
Posted:
Wednesday, November 6, 2013 - 12:00 am
Type:
Interior
Effective:
-
Details:
Nov. 6, 2013. Kindly be advised that 295 Buckingham Elevator is out of service due to damage to elevator doors. We have been informed by the service technician that the damage is substantial and that a further assessment is required to forecast the repair schedule. Updates will be made available.
Alternate Access:
Occupants are advised to use the elevator in 285 Buckingham in conjunction with the breezeway between buildings for multi-floor access. Updates will be made available.
For More Information:
405-53628, 338-82472
405-53628, 338-82472
Elevator 255 Buckingham: out of service
Posted:
Wednesday, October 30, 2013 - 1:00 am
Type:
Interior
Effective:
-
Details:
Oct. 30 2013: One elevator in 255 Buckingham is back in service
Alternate Access:
For More Information:
405-4495, 338-272
405-4495, 338-272
Temp path closure: AM.
Posted:
Thursday, October 24, 2013 - 1:00 am
Type:
Exterior
Effective:
Details:
Friday October 25, 7 am -9am. The walkways to and into Humanities eastern main entrance, Fine Arts Sculpture Bone-yard, and Burk Hall from Cafe Rosso into Garden of Remembrance and from the other direction garden to Cafe Rosso, generally known as Centennial Walk and/or Coffee Quad, will be closed to all traffic, including pedestrians, from 7:00 am to 9 am,
Alternate Access:
Main entrance and entrances outside the closure-perimeter; reiterated Humanities main entrance, Burk Hall from Cafe Rosso into Garden of Remembrance, and Fine Arts Sculpture Bone-yard, are expected to be open during this period.
For More Information:
405-3628, 338-2472
405-3628, 338-2472
Elevator Old Admin Building: repairs
Posted:
Tuesday, October 22, 2013 - 1:00 am
Type:
Exterior
Effective:
Details:
Tuesday Oct. 22. The elevator between OLD & New Administration building is out of service and undergoing repairs. It is expected to be operational, later this afternoon.
Alternate Access:
Please use Old Administration building elevator located at the Southwest corner of the Old Administration building while repairs are made.
For More Information:
405-3626 338-2472
405-3626 338-2472
Burke Hal: C. Wing elevator out of service
Posted:
Wednesday, October 16, 2013 - 1:00 am
Type:
Interior
Effective:
Details:
Oct. 16 AM. Old Burk Hall, C-Wing Elevator floors 1-3 is out of service. Elevator technician is troubleshooting.
Alternate Access:
The Two Eastern elevators floors 1-5 in Burke Hall Main building are available for use.
For More Information:
338-1568, 338-2472
338-1568, 338-2472
SSB elevators Temp. out of service
Posted:
Friday, October 11, 2013 - 1:00 am
Type:
Interior
Effective:
Details:
Friday 10/11/2013 at 1:30 pm. Both elevators are presently out of service. One elevator is expected back in service, after 3pm today.
Alternate Access:
If elevator service is needed within the next couple hours please contact the parties on floors above one to postpone or arrange alternate arrangements. Thank you.
For More Information:
DPRC 338-2472
DPRC 338-2472
Update: Access to Parking Lot 6 closed: AM 10/12
Posted:
Monday, October 7, 2013 - 1:00 am
Type:
Exterior
Effective:
-
Details:
Closing Service Road to Lot 6, has been moved up to Saturday, Oct 12, 2013. The road will CLOSE for all traffic, starting 7:00 am, and is expected back in service, late Saturday.
Alternate Access:
LOT(s) 6 is accessible from the State Drive, via an entry point behind towers. North State Drive will continue to service the parking garage from Lake Merced Blvd.
For More Information:
405-3628, 338-2472
405-3628, 338-2472
Elevator Repair: 235 Buckingham Way
Posted:
Tuesday, September 24, 2013 - 1:00 am
Type:
Interior
Effective:
-
Details:
Kindly be advised of an elevator shutdown in 235 Buckingham Way. Work will begin Wed. Sept 25, 7am through Thurs. Sept 26, 5pm.
Alternate Access:
Users will find the elevator in 225 Buckingham Way available as an alternative lift. The 225 elevator may be approached from within 235 Buckingham via connecting breezeways between each floor of either building, and of course from the ground floor of 225 Buckingham Way.
For More Information:
405-3628, 338-2472
405-3628, 338-2472
Mary Ward Hall Elevator, 1 of 2 is being repaired
Posted:
Wednesday, September 18, 2013 - 1:00 am
Type:
Exterior
Effective:
-
Details:
September 18. Mary Ward Hall elevator to the left (facing) is currently out of service and will remain out of service, pending repairs. The elevator is expected to be back in service in one week.
Alternate Access:
Please use elevator on the right.
For More Information:
338-1067 - 405-3628
338-1067 - 405-3628
Elevator Parking Structure 20: Functional
Posted:
Tuesday, September 10, 2013 - 1:00 am
Type:
Exterior
Effective:
Details:
Tuesday, October 10, Lot 20 Elevator near SSB - No service was required.
Alternate Access:
For More Information:
405-3628, 338-2472
405-3628, 338-2472
Humanities Building: Exterior Door Replacement
Posted:
Tuesday, September 10, 2013 - 1:00 am
Type:
Exterior
Effective:
-
Details:
Throughout the month of September the Humanities buildings exterior doors will undergo replacement. Beginning Wednesday Sept. 11 through Friday Sept. 13, contractors will be working at the west exterior entrance of the Humanities building, near room 120. Followed by: North entrance on Sept. 18 -19th (Wednesday through Friday). South entrance on Sept. 25 -27th (Wednesday through Friday).
Alternate Access:
While doors are being replaced in one area - All other exterior doors will be available.
For More Information:
338-2472
338-2472
Update, Elevator: Ethnic Studies/Phyc Build. Back in service.
Posted:
Friday, September 6, 2013 - 1:00 am
Type:
Interior
Effective:
-
Details:
PSY elevator is reported back in service, as of ~ 10:30am today.
Alternate Access:
For More Information:
405-3628 338-2472
405-3628 338-2472
Science Building
Posted:
Tuesday, August 20, 2013 - 1:00 am
Type:
Exterior
Effective:
-
Details:
On the morning of August 22, between 7am - 9am the south west walkways in front of the Science building, facing the Greenhouse and Quad will be closed to facilitate operation of a crane lift, and scheduled work.
Alternate Access:
Please use the Science buildings south east entrance, approachable from the north western corner of the HSS building during this time period.
For More Information:
405-3628, 338-2472
405-3628, 338-2472
Fire Alarm Testing: Gym and Sci Building
Posted:
Friday, August 16, 2013 - 1:00 am
Type:
Interior
Effective:
-
Details:
On Thursday 08/22/2013, between 8am and noon audible and visual Fire Alarm tests will be conducted in the Science Building and GYM Men's shower room.
Alternate Access:
This is an informational note - No need for alternate access.
For More Information:
338-2472
338-2472
HSS Building, Fire Alarm Test: 08/15; 1- 2 pm.
Posted:
Tuesday, August 13, 2013 - 1:00 am
Type:
Interior
Effective:
-
Details:
On Thursday August 15, there will be a fire alarm test in HSS building. The system test will occur between 1:00 pm to 2:00 pm. The test will be performed by Simplex and Fire Marshal in new physical therapy lab (HSS-114), Fire Marshal may approve a silent test, but she usually require live test.
Alternate Access:
Fire alarm test is just a test, please observe fire alarm procedures if directed to do so by supervisors or faculty.
For More Information:
405-3628, 338-2472
405-3628, 338-2472
Science Building: Restrooms Open
Posted:
Thursday, August 8, 2013 - 1:00 am
Type:
Interior
Effective:
Details:
Thursday Aug. 8: Domestic Cold Water service has been repaired, restrooms are being opened.
Alternate Access:
For More Information:
338-1568, 338-2472
338-1568, 338-2472
Lot 20 Elevator South side near bridge
Posted:
Tuesday, August 6, 2013 - 1:00 am
Type:
Exterior
Effective:
Details:
08/06/2013: Lot 20 Elevator South side, is currently out of service. Workman is performing repairs and reports that additional repairs may continue to be off and on as fixes may be ongoing.
Alternate Access:
Please use North elevator when parking in lot 20.
For More Information:
338-1568, 338-2472
338-1568, 338-2472
Exterior Door Replacement
Posted:
Thursday, July 18, 2013 - 1:00 am
Type:
Exterior
Effective:
-
Details:
Between the end of July and mid August exterior doors of the following buildings will be replaced: Admin 5th floor terrace to east stair exit. Creative Arts, exterior door exit from Basement and, the exterior door exit from TV studio 2; both are exits with stairways. Fine Arts, exterior door from Sculpture Room (exit with stairs). Burk Hall, exterior door pair near waterfall along ramp and stairs as well as the main south entry from Garden of Remembrance. Humanities, north, west and, south entrances. Please note, if an existing door has a door operator a new operator will be installed and other doors with operators will be functional throughout the replacement process.
Alternate Access:
During the first phase of replacement doorways with door operators are not affected. From mid-August through August 24 the following buildings will have doors with operators replaced. Alternative access will be available by doors with operators while work is in process. Burk Hall, exterior pair of doors near waterfall along ramp and stairs and the main south entry from Garden of Remembrance. Humanities, north entrance, west entrance, south entrance.
For More Information:
338-7089, 338-2472
338-7089, 338-2472
Library main entrance: delivery trucks
Posted:
Thursday, July 18, 2013 - 1:00 am
Type:
Exterior
Effective:
-
Details:
Library is receiving a large shipment of furniture on Monday, July 29th & Tuesday, July 30th. pedestrian areas between ADM and LIB buildings will be affected. While minimum disruptions are expected pedestrians may expect some impact. When traveling between the East end of the Library and south end of Admin from Holloway into the main North East Library entrance be aware of trucks and workers unloading cargo.
Alternate Access:
To avoid the delivery site altogether, please use the South West Library entrance from the lower floor facing Creative Arts and the C. Chavez Center; from there one may take elevators.
For More Information:
338-1639, 338-2453
338-1639, 338-2453