Alerts


List of past alerts
Alerts Effective Dates
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-

    Campus Paths: Thanksgiving Break

    Posted:
    Friday, November 20, 2015 - 12:00 am

    Type:
    Exterior

    Effective:
    -

    Details:
    Posted Nov 20. The Irrigation controller replacement work will finish Thanksgiving Week on Monday 11/23 and Tuesday or Wednesday 24/25. Some pathways in the Quad, the path in between Creative Arts and Fine Arts and the path next to HHS along 19th Avenue will be closed off for concrete and asphalt work. Thank you for your patience.

    Alternate Access:
    In general paths will be open, however we should expect areas to be taped off while concrete and/or asphalt is being poured. Areas in particular that will require an alternative route is between creative arts and fine arts, and HSS and Admin from 19th Ave. If entering campus from 19th and Holloway, please use Holloway sidewalk and enter at the Library north. When entering campus from Centennial Drive please use the path between Burke Hall and Creative Arts or Holloway sidewalk, entering at the Library south. Plywood may be used to cover the newly poured concrete and asphalt areas to protect drying and curing but allow walkway access.

    For More Information:
    405-3628 338-2472

    Tree Maintenance: Paths affected

    Posted:
    Sunday, November 15, 2015 - 12:00 am

    Type:
    Exterior

    Effective:
    -

    Details:
    The week of Nov. 10 through 15: Campus paths in portions between Admin and HSS as well as within the HSS Courtyard and the courtyard in front of the Gymnasium may be periodically cordoned off while trees are pruned. Crews will also be removing a tree located in the area of University Park North, Building Nine. Please be aware when traveling along these paths this week.

    Alternate Access:
    Work will generally be done early in the morning. Pathways should not be completely blocked. However please recognize that paths may be temporary blocked with trucks hauling debris. Please use alternate routes to the Gym, and HSS, and around UPN Building 9.

    For More Information:
    338-2472 338-1568

    Sci Building South Entrance

    Posted:
    Thursday, November 12, 2015 - 12:00 am

    Type:
    Exterior

    Effective:
    -

    Details:
    Nov 13 & 14 2015. Please be aware the night of November 13, and on Saturday Nov. 14 the southern accessible entrance to the Science Building will be used to transport equipment in and out of the building. Due to the size and shapes of the equipment, along with destinations of delivery this particular entrance must be used.

    Alternate Access:
    Patience while workers are engaged in the unloading and loading of equipment in and out of the building will help the University meet the aim of completing the renovation project by the end of the year.

    For More Information:
    338-2472, 338-1568

    SCI Building: Path Closure, Nov 21

    Posted:
    Thursday, November 12, 2015 - 12:00 am

    Type:
    Exterior

    Effective:
    -

    Details:
    Correction: Nov. 21, 2015. Capital Planning & Construction is advising, that in connection with the SCI Lab remodeling project, Science Building (SCI) will be closed, on Saturday November 21, 2015 from 7am to 5pm. Please be aware, at 7am construction equipment will begin arriving on campus via South State Drive. Trucks will travel along the road/bike way behind the Gym toward Thornton Hall, and the northeastern paths of the Quad. Expect periodic traffic delays along this roadway and the associated parking areas and paths surrounding the Science building, Thornton & Henisill Hall throughout the day. Saturday morning work crews will begin closing select pathways around the SCI and the northeastern section of the Quad at 7am. For reasons of public safety, and to assist with the efficient operations of the work that needs to be done, please respect the campuses need to keep taped-off pathways and surrounding areas closed to public travel. Do not cross into taped-off areas.

    Alternate Access:
    Please detour from using paths leading through the north east section of the Quad, where SCI, the Gym and Thornton Hall intersect. The ramp adjacent to the Business building's exterior elevator, facing the Quad will be closed, please use the HSS courtyard to access or exit from this elevator. HSS courtyard is accessible via the path leading from 19th Ave and Holloway between HSS and the Administration Building. Pathway access to Thornton and Hensill Hall from 19th Ave will be open, however we should expect construction crews and equipment to be actively utilizing portions the paths and service roads throughout the day.

    For More Information:
    338-2472, 338-1568

    Path Closure: Creative Arts and HSS

    Posted:
    Tuesday, November 10, 2015 - 12:00 am

    Type:
    Exterior

    Effective:
    -

    Details:
    November 11 - 13: Two paths on campus will be temporarily closed. 1. The path leading from Humanities and Tapia drive between Creative Arts and Fine Arts will be closed throughout the day of November 11th Veterans day. 2. The northeastern entrance/exit to HSS facing 19th Ave will be closed from November 11 through Friday the 13th. Path closure is part of CPCD's the campus irrigation system upgrade and improvement project.

    Alternate Access:
    To enter the Quad, and campus at large from Tapia Drive, Centennial Drive, and the Humanities Building, please use the sidewalk along Holloway and/or the path between Burke Hall and Creative Arts. To enter and exit HSS on Thursday and Friday, please use available HSS alternative entrance/exits while the work is being done. The Campus will be closed Wednesday in observance of Veterans Day.

    For More Information:
    338-2472, 338-1568

    Parking Structure: Elevator Out of service

    Posted:
    Tuesday, November 3, 2015 - 12:00 am

    Type:
    Exterior

    Effective:
    -

    Details:
    Wed. Oct 28. Parking garage elevator near SSB continues to be out of service, awaiting new door sills. Custom fabrication is required there will be some delay in their availability.

    Alternate Access:
    Please use the elevator located at the north western corner, and/or other handicapped Blue Zone parking that may be available to your SFSU Parking Permit.

    For More Information:
    338-2472 338-1568

    Nov 11 Campus Closed

    Posted:
    Tuesday, November 3, 2015 - 12:00 am

    Type:
    Other

    Effective:
    -

    Details:
    Please be aware, in recognition of Veterans Day November 11, 2015, SF State campus offices will be closed.

    Alternate Access:
    In case of emergency please call 911. For campus non-emergency phone 415-338-7200

    For More Information:
    338-7200

    SCI Building Path closure

    Posted:
    Friday, October 23, 2015 - 1:00 am

    Type:
    Exterior

    Effective:
    -

    Details:
    Oct. 22, 2015. Capital Planning & Construction is advising, that in connection with the SCI Lab remodeling project, Science Building (SCI) will be closed, on Saturday October 24, 2015 from 7am to 5pm. Please be aware, at 7am construction equipment will begin arriving on campus via South State Drive. Trucks will travel along the road/bike way behind the Gym toward Thornton Hall, and the northeastern paths of the Quad. Expect periodic traffic delays along this roadway and the associated parking areas throughout the day. Work crews will also begin closing select pathways around the SCI and the northeastern section of the Quad at 7am. For reasons of public safety, and to assist with the efficient operations of the work that needs to be done, please respect the campuses need to keep taped-off pathways and surrounding areas closed to public travel. Do not cross into taped-off areas. For full description of path closures go the the Access Alert Webpage at: http://www.sfsu.edu/alerts

    Alternate Access:
    Please detour from using paths leading through the north east section of the Quad, where SCI, the Gym and Thornton Hall intersect. The ramp adjacent to the Business building's exterior elevator, facing the Quad will be closed, please use the HSS courtyard to access or exit from this elevator. HSS courtyard is accessible via the path leading from 19th Ave and Holloway between HSS and the Administration Building. Pathway access to Thornton and Hensill Hall from 19th Ave will be open, however we should expect construction crews and equipment to be actively utilizing portions the paths and service roads throughout the day.

    For More Information:
    338-2472, 338-1568

    Elevator EP Building, back in service @10:10am

    Posted:
    Wednesday, October 21, 2015 - 1:00 am

    Type:
    Interior

    Effective:


    Details:
    Oct. 21, 2015 The elevator in the Ethnic Studies, Psychology (EP) building is back in service.

    Alternate Access:
    For More Information:
    338-2472 338-1568

    Burk Hall East Wing Elevator repair

    Posted:
    Wednesday, October 21, 2015 - 1:00 am

    Type:
    Interior

    Effective:
    -

    Details:
    October 21, 2015 3:53pm. One of two side by side elevators, in Burk Hall (BH), is out of service. Elevator technician has been dispatched.

    Alternate Access:
    Elevator number 1 next to elevator 2 is operational. The eastern bank of elevators serves floors 1 through 5.

    For More Information:
    338-2472, 338-1568

    Parking Garage S. Side Elevator Out of Service

    Posted:
    Wednesday, October 14, 2015 - 1:00 am

    Type:
    Exterior

    Effective:
    -

    Details:
    Oct. 14, 2015, UPDATE: The South side elevator leading to SSB and the Campus will be out of service until October 20, 2015.

    Alternate Access:
    The second elevator in Parking Garage, on the North side near Corporation Yard, is available for use.

    For More Information:
    338-1568, 338-2472

    Thorntan Hall: All elevators are operational

    Posted:
    Wednesday, October 14, 2015 - 1:00 am

    Type:
    Interior

    Effective:
    -

    Details:
    Oct. 14, 2015. UPDATE All elevators are now operational.

    Alternate Access:
    For More Information:
    338-2472, 338-1568

    CA building: UPDATE Elevator is operational

    Posted:
    Wednesday, October 14, 2015 - 1:00 am

    Type:
    Interior

    Effective:
    -

    Details:
    October 14, 2015. UPDATE Elevator is operational.

    Alternate Access:
    Full access to the second floor, Radio Station and CA Computer Graphics is available via the elevator near BECA Cage and Room 127. Access to the basement classrooms is also available from this elevator.

    For More Information:
    338-1568, 338-2472

    Campus Tree Maintenance: Pathways

    Posted:
    Tuesday, October 13, 2015 - 1:00 am

    Type:
    Exterior

    Effective:
    -

    Details:
    Oct 13, 2015. The campus will be engaged in various tree maintenance tasks over the next few months. Tree removal and the accompanying grounds work may require blocking paths on campus. On Oct. 13 tree removal crews will be working within the HSS Building courtyard, facing the office stop and 19th Ave. Be aware workers will be in the area. Crews work will begin in early morning hours to lessen the impact on pedestrian traffic, and noise within the surrounding classrooms.

    Alternate Access:
    Paths will be cordoned off while work is being done, please use alternate routes to HSS Building courtyard leading from 19th Ave, in the area of the coffee stop and BART Shuttle loading area.

    For More Information:
    338-1568, 338-2472

    Humanities Building: 1 of 3 elevators out of service

    Posted:
    Wednesday, October 7, 2015 - 1:00 am

    Type:
    Exterior

    Effective:
    -

    Details:
    Oct. 6, 2015. One of the two elevators in Humanities Building (HUM) main lobby will be out of service, pending repairs. HUM has 2 other functioning elevators in the building.

    Alternate Access:
    Please use the adjacent elevator within the lobby, and/or the elevator located at the northern part of the building.

    For More Information:
    338-5568, 338-2472

    225 Buckingham Elevator out of service

    Posted:
    Wednesday, October 7, 2015 - 1:00 am

    Type:
    Interior

    Effective:
    -

    Details:
    Oct 6, 2015 Update: The Elevator of 225 Buckingham Apartments remains out of service. University Property Management and Campus Facilities are awaiting parts to complete repairs. Updates will be posted.

    Alternate Access:
    Please use the breezeway between buildings while this elevator is out of service and undergoing review and repair. If there is an emergency please call 911.

    For More Information:
    338-2472 or 338-7200

    Terrace Elevator: CC Student Center

    Posted:
    Wednesday, October 7, 2015 - 1:00 am

    Type:
    Exterior

    Effective:
    -

    Details:
    Sept. 4 Message from the Sr. Director of SFSU Facilities: Dear Campus Community I am pleased to announce that all but one elevator on both the academic campus, and within University Property Management areas are functional. The out of service elevator is the exterior terrace elevator at the Cesar Chavez Student Center. An emergency PO has been input today for a replacement of its 'door sill', which has warped due to weather exposure induced oxidation. This repair is expected to take several weeks. The affected area is the exterior access to the seating atop the pyramid; access to occupied areas of the Cesar Chavez Student Center are unaffected. As follow up to the elevator outages experienced this week, we have engaged our elevator consultant to conduct an investigation, and make recommendations to increase our resilience in this area. Thank you all for your patience during this time. Please know that we take elevator function very seriously, and always take steps to ensure the safety of our elevators before returning them to service. Please contact the Facilities Customer Service Center at extension 81568 if you observe any issues with elevators, or other facilities related issues.

    Alternate Access:
    If you have planned to meet someone atop the Cesar Chavez Center, a.k.a. the *pyramid* roof area, please arrange for another meeting place, until the elevator issue is resolved. Thank you all for your patience during this time.

    For More Information:
    338-2472, 338-1568

    Ethnic Studies-Psych Building Elevator is Operational

    Posted:
    Thursday, October 1, 2015 - 1:00 am

    Type:
    Interior

    Effective:


    Details:
    Thursday October 1, 2015. The elevator within the Ethnic Studies-Psychology building was out of service for a brief time today and has been returned to service.

    Alternate Access:
    No alternative access actions required at this time.

    Elevator Operational: Ethnic Studies Psychology EP

    Posted:
    Tuesday, September 29, 2015 - 1:00 am

    Type:
    Interior

    Effective:
    -

    Details:
    5:30 pm Sept 29, 2015. The elevator service has been restored

    Alternate Access:

    Science Building: Water Shutoff

    Posted:
    Monday, September 21, 2015 - 1:00 am

    Type:
    Interior

    Effective:
    -

    Details:
    Posted Sept, 21, 2015. In order to facilitate work on the Science Chemistry Laboratory Repair Project, Capital Planning & Construction has scheduled the following water service shutdown in the Science Building on Saturday, 9/26/15, from 8am to 5pm. This will effect the restrooms and Labs.

    Alternate Access:
    Please be aware that the restrooms within the Science Building will not be operational on Saturday Sept. 26 from 8am till 5pm. Restrooms in surrounding buildings will be operational.

    For More Information:
    338-2472, 338-1568

    Crosswalk detour: Font at Mary Ward

    Posted:
    Wednesday, September 16, 2015 - 1:00 am

    Type:
    Exterior

    Effective:
    -

    Details:
    Sept. 17. Please be aware, PG&E will be excavating equipment in the street that runs between Mary Ward and the Villages. Work is likely to impact delivery trucks that unload at that location, however it should not interfere with the traffic to and from the Village Garage. Excavation work is expected to begin around 7am on Thursday, 9/17/15 and complete before 5pm the same day. The crosswalk along Font may be affected.

    Alternate Access:
    If PG&E's work team and equipment is blocking the crosswalk in this area please use the path between the Towers and the Village to enter campus.

    For More Information:
    338-2472, 338-1568

    Centennial Village Elevator C: Is working

    Posted:
    Monday, September 14, 2015 - 1:00 am

    Type:
    Interior

    Effective:
    -

    Details:
    Sept. 14, 2015. Kindly be informed that Village C elevator is back in service.

    Alternate Access:
    For More Information:
    338-1067, 338-2472

    N W Elevator: Parking Structure 20 19

    Posted:
    Tuesday, September 1, 2015 - 1:00 am

    Type:
    Exterior

    Effective:
    -

    Details:
    September 1. 10:55am. Kindly be advised that Parking Garage N.west side elevator near corporation yard, is out of service, pending assessment. Update will be posted.

    Alternate Access:
    Please use the Parking Garage's east side elevator, near SSB and the sky-bridge on the fifth level.

    For More Information:
    338-2472, 338-1568

    Humanities Building: Elevators are Operational

    Posted:
    Friday, August 28, 2015 - 1:00 am

    Type:
    Interior

    Effective:
    -

    Details:
    UPDATE, Aug. 28 2015. 12:06 Elevators are back in service

    Alternate Access:
    Updates will be posted.

    For More Information:
    338-2472

    Update:Humanities Building Elevators back in Service

    Posted:
    Friday, August 28, 2015 - 1:00 am

    Type:
    Interior

    Effective:
    -

    Details:
    UPDATE Noon 08/28/2015 Elevators are back in service

    Alternate Access: