Alerts
Fine Arts Building Elevator 2
Posted:
Monday, July 27, 2015 - 1:00 am
Type:
Interior
Effective:
-
Details:
July 27 through Friday July 31. Elevator number two within the Fine Arts Building will be undergoing repairs and will be out of service. Elevator number two services floors 1 through 5.
Alternate Access:
During repairs floors three through five will not be accessible via elevator. For those who have appointments with offices within floors three through five, please contact your meetings organizer to arrange for an alternate meeting place. Elevator access to the second floor of the Fine Arts building is available from the elevator located across from the south west entrance of the Creative Arts Building within the vicinity of the department of industrial design.
For More Information:
405-3628 338-2472
405-3628 338-2472
Burk Hall Elevator C: Repairs
Posted:
Wednesday, July 22, 2015 - 1:00 am
Type:
Interior
Effective:
-
Details:
July 23 - 24 Thursday through Friday morning. Burk Hall's C-wing elevator, servicing the West end of the building floors B through 3, will be out of service from Thur. 7/23, 3pm to Fri. 7/24, 8am, for generator repair.
Alternate Access:
If you have appointments, or need to meet with office personnel, please call to reschedule to an accessible location, and/or arrange for alternative access assistance to the basement storerooms or offices that are directly served by elevator C, and associated wheelchair platform lifts.
For More Information:
405-3628 338-2472
405-3628 338-2472
Thornton Hall: water shutdown
Posted:
Thursday, July 16, 2015 - 1:00 am
Type:
Interior
Effective:
-
Details:
July 18. Please note the building wide water shutdown on Saturday, 7/18 from 7am to 5pm to accommodate the repair/service of the fire sprinkler system. All restrooms and labs will be affected.
Alternate Access:
Be aware, Thornton Hall will not have restroom facilities or, water fountains throughout they day of July 18.
For More Information:
4053628 3382472
4053628 3382472
Creative Fine Arts Building and Pathway Closed
Posted:
Thursday, July 2, 2015 - 1:00 am
Type:
Exterior
Effective:
-
Details:
Weekend of July 11-12: There will be construction activity on Saturday, July 11, 2015 from 7:00 AM - 3:00 PM on the plaza north side of Creative Arts and southwest side of Student Center. There will be equipment in the west plaza that will lift the new CH-1 chiller unit to the roof of the 5 story Fine Arts Addition Building. Be aware - The accessible path of travel between Fine Arts and Creative Arts will not be available. The southwest exits of Cesar Chavez Student Center will be detoured. The east exits of Creative Arts Building will be detoured. No occupants will be allowed into the Fine Arts Addition Building.
Alternate Access:
The alternate accessible path will be along Holloway Avenue into Creative Arts and Library.
For More Information:
338-7200, 338-2472
338-7200, 338-2472
Book Store Construction
Posted:
Thursday, June 18, 2015 - 1:00 am
Type:
Exterior
Effective:
-
Details:
The SFSU Bookstore is closed for remodeling. Workers will be present at the exterior entrance facing the Gym. The area that sides with the ATM Machines may periodically be affected. A fence will be installed at the exterior to delineate the work space from public, and a plastic sheet wall on the interior to separate the construction area from retail operations. We anticipate some dust and noise from the construction site. Construction is expected to complete by July 10, 2015.
Alternate Access:
No alternate access to the Bookstore as it is closed. ATM access will remain available from the path along the main entrance of the gym; be aware of trucks and workman in the area.
For More Information:
338-1568, 338-4272
338-1568, 338-4272
Elevator 225 Buckingham:Back in Service
Posted:
Sunday, March 29, 2015 - 1:00 am
Type:
Interior
Effective:
-
Details:
Update March 27, 2015. The elevator within 225 Buckingham Way is back in service.
Alternate Access:
No alternate access is required. Thank you to SFSU Facilities for their attention, and to residents for patience during the repair cycle.
For More Information:
405-3628, 338-2472
405-3628, 338-2472
Path and sidewalk work: Spr.Break 03/23-04/01
Posted:
Monday, March 23, 2015 - 1:00 am
Type:
Exterior
Effective:
-
Details:
Beginning March 23 through April 1. Sidewalk and pathway work will be conducted in the following 2 locations: noted below: March 24, replacement of bollards, outside of the Student Student Services Building at 5 Corners. Building at Five Corners, along with Followed with sidewalk trip hazard repair along Lake Merced Blvd.
Alternate Access:
Student Services path alternative route. Please pass between the Student Services Building and Centennial Village C. to reach the Towers and other dormitories, as well as the Parking Lot 19/20. Lake Merced Blvd sidewalk alternative route. Please use the sidewalk on the opposite side of the street.
For More Information:
338-2472, 338-1568
338-2472, 338-1568
Elevator service: 295 Buckingham
Posted:
Tuesday, January 13, 2015 - 12:00 am
Type:
Interior
Effective:
Details:
01/13/2015. Housing service desk reported elevator in 295 Buckingham, out of service. Elevator tech has been notified.
Alternate Access:
Please use the connected breezeways to the adjacent building while 295 Buckingham elevator is being serviced.
For More Information:
405-3628, 338-2472
405-3628, 338-2472
Parking Lot #20 elevator: service check
Posted:
Monday, January 12, 2015 - 12:00 am
Type:
Exterior
Effective:
-
Details:
01/13/2015. Service checks on the Parking Lot #20 elevator adjacent to corporation yard, will start at 6am on Thursday, Jan 13, 2015. We anticipate testing to complete by 10am.
Alternate Access:
Please use alternate elevator at South West end of Lot 20 if needed.
For More Information:
405-3869 , 338-4272
405-3869 , 338-4272
Campus Pathway paving repairs: Winter break 2015
Posted:
Friday, January 9, 2015 - 12:00 am
Type:
Exterior
Effective:
Details:
Beginning January 12 through January 26 contractors will be working to repair portions of SFSU's pathways and sidewalks. Repair work will entail demolishing and repairing, cross-slope, and trip hazards at various locations throughout campus. Work will be done as quickly as possible Mondays through Saturday. Please be aware that following areas will periodically be cordoned off: Lake Merced Blvd., sidewalk repairs. Font Blvd., sidewalk repairs from Mary Park Centennial Village parking garage driveway toward Tapia. Humanities Building / Tapia sidewalk repair. Burk Hall Courtyard / Garden of Remembrance, please note, Burk Hall/Fine Arts Courtyard will have multiple pathway closures, please use accessible entrance at East Entrance. Campus Quad, inner paths of the Quad running from the middle of the Business building path toward the Campus Bookstore and ATM stations. Science Building elevator entrance - the contractors will work so access is always available. Ethnic Studies and Psychology Building path, leading to the Student Health Center Mound. Five Corners, bollards and motor traffic gate area. Entrance to Lot 25. One side of the entrance to the lot will always be open. During the period of construction flags will be available to direct cars in and out of the lot. If necessary, updates will be posted.
Alternate Access:
Burk Hall Courtyard / Garden of Remembrance, please note, Burk Hall/Fine Arts Courtyard will have multiple pathway closures, please use accessible entrance at East Entrance. If necessary, updates will be posted.
For More Information:
405-3628, 338-2472
405-3628, 338-2472
Elevators Buisness Building March 26-27, 2015
Posted:
Wednesday, January 7, 2015 - 12:00 am
Type:
Exterior
Effective:
Details:
March 26 & 27, 2015. Elevators in the Business building will undergo repairs & maintenance on 3/26-3/27/15, and there will be no elevator service during this period. The shutdown is necessary to ensure continuous operations of the elevators in future
Alternate Access:
March 26 & 27 fall on a Thursday and Friday during Spring Break, please schedule appointments and communicative with supervisors if alternate access to the buildings upper floors are required.
For More Information:
405-3628 338-2472
405-3628 338-2472
Parking structure: Lot 19 & 20
Posted:
Wednesday, January 7, 2015 - 12:00 am
Type:
Exterior
Effective:
-
Details:
January 2015. The West entrance to the garage is expected to be closed off for a few more weeks, the East and North West garage entrance is open and all garage services are operational.
Alternate Access:
PLease use the West and North West entrance.
For More Information:
405-3628 338-2472
405-3628 338-2472
Elevators Buisness building March 26-17, 2015
Posted:
Wednesday, January 7, 2015 - 12:00 am
Type:
Interior
Effective:
Details:
March 26 &27, 2014. Elevators in the Business building will undergo repairs & maintenance on 3/26-3/27/15, and there will be no elevator service during this period. The shutdown is necessary to ensure continuous operations of the elevators in future
Alternate Access:
March 26 & 27 fall on a Thursday and Friday during Spring Break, please schedule appointments and communicative with supervisors if alternate access to the buildings upper floors are required.
For More Information:
405-53628 338-2472
405-53628 338-2472
Student Services Building, SSB: elevator maintenance
Posted:
Monday, January 5, 2015 - 12:00 am
Type:
Exterior
Effective:
Details:
January 6, 6am -8am both SSB elevators are scheduled for maintenance checks and out of service.
Alternate Access:
If elevator service is required, please schedule appointments and/or work schedules to allow for this elevator maintenance schedule.
For More Information:
405-3628 338-2472
405-3628 338-2472
Elevators on Campus
Posted:
Wednesday, December 3, 2014 - 12:00 am
Type:
Exterior
Effective:
Details:
Dec. 3. Numerous elevators are reported out of service. LIB #5, Student Union 4 stop (kitchen), Henil Hall #2 & #4 (service, Village A, Mary Park (left side).
Alternate Access:
Please use the alternate elevators within the buildings affected while technicians respond to the outages.
For More Information:
338-1568, 338-2453
338-1568, 338-2453
Ethnic - Phycology Building: Elevator Notice
Posted:
Friday, September 5, 2014 - 1:00 am
Type:
Interior
Effective:
-
Details:
September 3 and September 4 2014: The elevator in Ethnic/Psychology Building is operating intermittently. SF State is working to resolve the issue as quickly as possible.
Alternate Access:
If you need access to services, work-spaces or meeting rooms, please call the office you need to reach and/or your supervisor to make alternative meeting arrangements. DPRC may also help facilitate classroom relocation or communication between students and faculty, if necessary. Please call, e-mail, or visit DPRC for assistance. Location: SSB 110 Phone: 415 338-2472 (v/tdd) e-mail: dprc@sfsu.edu Office Hours: M, T, R, F: 8:30-4:30; W: 8:30-2:45
For More Information:
338-1568, 338-2472
338-1568, 338-2472
Path Closed: between Gym and Ethnic / Psych Building
Posted:
Friday, September 5, 2014 - 1:00 am
Type:
Exterior
Effective:
-
Details:
August 28, Update, Please be aware that ground work is being done at the base of the path where Parking Lot 6 and the path between the Gym and Ethnic/Psychology Building. Presently direct passage is blocked off, and is likely to be intermittently blocked as work progresses.
Alternate Access:
The most direct alternative access pedestrian/wheelchair to parking Lot 6 is available through use of the ramp at the far end of the parking structure. Access from the Ethnic/Psychology Building will be to your right, access from the parking structure and handicapped parking outside of the structure will be to the left of the structure, and your right as you approch.
For More Information:
338-1568, 338-2472
338-1568, 338-2472
Student Services Building: Elevators Out of Service
Posted:
Wednesday, September 3, 2014 - 1:00 am
Type:
Interior
Effective:
-
Details:
August 27, 2014 Update: The elevators in the Student Services Building (SSB) remain only intermittently operational. SF State is working to resolve the issue as quickly as possible. An update will be posted when the matter is resolved.
Alternate Access:
If you need access to services, workspaces or meeting rooms on SSB floors 2,3, or 4, please call the office you need to reach and/or your supervisor to make alternative meeting arrangements. The Disability Programs and Resource Center (DPRC)is available to facilitate alternate meeting arrangements, as needed. Please call, e-mail, or visit DPRC for assistance. Location: SSB 110 Phone: 415 338-2472 (v/tdd) e-mail: dprc@sfsu.edu Office Hours: M, T, R, F: 8:30-4:30; W: 8:30-2:45
For More Information:
338-2472, 405-3628
338-2472, 405-3628
Parking Structure 20 -19: elevators operational
Posted:
Thursday, August 28, 2014 - 1:00 am
Type:
Exterior
Effective:
-
Details:
August 28, Parking garage elevator #1 is back in service. Additionally, the Elevator on the NW end of the garage (near Corp Yard) continues to be available for use.
Alternate Access:
For More Information:
338-7013, 338-2472
338-7013, 338-2472
Burke Hall: C Wing Elevator out of service
Posted:
Monday, August 25, 2014 - 1:00 am
Type:
Interior
Effective:
-
Details:
August 19-25 Update: Burk Hall - C wing, west end elevator is out of service. If one has appointments with the Dept. of Secondary Education please call the office to make arrangements for assistance, and/or to request an alternative meeting place. Elevator service to all floors except the Basement are available at the east end of the building. Updates will be posted.
Alternate Access:
While C Wing elevator is inoperable one may request assisted access to the Dept. of Secondary Education, and Basement storage rooms by contacting The Disability Programs and Resource Center (DPRC) during office hours; Monday through Friday, 8:30 - 4:30.
For More Information:
338-2472, 405-3628
338-2472, 405-3628
Business Building: N. Door repairs
Posted:
Wednesday, August 20, 2014 - 1:00 am
Type:
Exterior
Effective:
-
Details:
August 20. Business Building: N. Door is being retrofitted with new equipment. Workers will periodically be present. Updates will be posted as they become avalable.
Alternate Access:
If in need of an automated door, please use the eastern and southern entrance/exits.
For More Information:
338-1568, 338-2472
338-1568, 338-2472
HSS Door way: one of five
Posted:
Friday, August 15, 2014 - 1:00 am
Type:
Exterior
Effective:
-
Details:
August 19. The ADA accessible entrance of HSS near room 0101 will be closed on Tuesday August 19th from approximately 8am till 12pm. The area will need to be cordoned off to allow for scaffolding to be set up to replace a broken window pane in HSS 0200 just above this entrance.
Alternate Access:
Please use alternate entrance/exits while work is being done
For More Information:
338-2472, 338-1568
338-2472, 338-1568
Science Building: Toilet Rooms Open
Posted:
Friday, August 15, 2014 - 1:00 am
Type:
Interior
Effective:
-
Details:
Restrooms are now open
Alternate Access:
For More Information:
338-1568
338-1568
SSB Elevator 1: maintenance
Posted:
Friday, August 15, 2014 - 1:00 am
Type:
Interior
Effective:
-
Details:
On September 13, one of two elevators within the Student Services Building is scheduled for maintenance.
Alternate Access:
The Student Services Building has two elevators, the elevator adjacent to the one being repaired will be operational.
For More Information:
338-2472, 338-1568
338-2472, 338-1568
PSY & GYM pathway Closed
Posted:
Wednesday, August 6, 2014 - 1:00 am
Type:
Exterior
Effective:
-
Details:
Aug 6,he pathway between PSY & GYM and has scheduled unexpected excavation and repairs. This pathway will temporarily CLOSED. and will reopen upon completion of repairs.
Alternate Access:
Please use Blue Zone Parking in Lot Structure 20 and 19.