Alerts


List of past alerts
Alerts Effective Dates
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-

    Annual Holiday Electrical Checks

    Posted:
    Friday, November 18, 2011 - 12:00 am

    Type:
    Interior

    Effective:
    -

    Details:
    Below is a schedule episodic shutdowns are performed during the Thanksgiving and Christmas Holiday. Closures scheduled during these times aim to lessen the impact on the campus community. Thanksgiving break Nov. 25: 7am- 11am, Student Services Building Student health Lot 20 and Lift station. 11am-3:30pm, Corp Yard, Central Plant, Waste Management, Annex 1 &2, Children's Campus. An additional notification will be sent out about December 21, 2011 to remind the community of the upcoming Christmas closure shutdowns. Though not anticipated, these schedules are subject to change. The shutdowns include a variety of tests, which include exercising panel breakers, testing emergency lights and exit signs, as well as briefly testing the audible fire alarms in those buildings. All procedures attempt to assure the reliability of our life safety equipment.

    Alternate Access:
    For More Information:
    338-1568

    Elevator is Operational in Psych/Ethnic Studies Building

    Posted:
    Friday, October 28, 2011 - 1:00 am

    Type:
    Interior

    Effective:
    -

    Details:
    Facilities is pleased to announce that the elevator at the Ethnic Studies / Psychology Building is back in service. The elevator technician is continuing to monitor the cars operation. At this time we do not anticipate any further problems related to this issue. Thanks again for your patience and understanding in these matters.

    Alternate Access:
    Elevator is operational

    For More Information:
    4053628 3382472

    Psychology Building Power Door Operator South

    Posted:
    Wednesday, October 26, 2011 - 1:00 am

    Type:
    Exterior

    Effective:
    -

    Details:
    South side entrance power door operator of the Psych/Ethnic Studies Building is being serviced. Out of service signs are on the door operator while it is being adjusted.

    Alternate Access:
    North side power door is operational. Accessible South side manual door is functioning.

    For More Information:
    3381698 3382472
    build@sfsu.edu
    www.sfsu.edu/~build

    Burke Hall Power Door, East Entrance/Exit: Out-of-Service

    Posted:
    Wednesday, October 12, 2011 - 1:00 am

    Type:
    Exterior

    Effective:
    -

    Details:
    East entrance and exit Power Door operators are not operational. Repair date pending.

    Alternate Access:
    South Side C wing Power door is operational. Enter/Exit via the western path to the Garden of Remembrance between Burke Hall @ Cafe Rossa and Fine Arts or, via the North entrance @ the back end of the C. Chavez Student Center to the Garden of Remembrance.

    For More Information:
    338-2472

    Replace Exterior Doors at Various Campus Buildings UPDATE

    Posted:
    Tuesday, October 11, 2011 - 1:00 am

    Type:
    Exterior

    Effective:
    -

    Details:
    Effective Friday October 14, 2011 at 7:00 a.m. work on the north entry of Creative Arts Building leading to Knuth Hall and McKenna Theatre will begin. Work is planned to take no longer than one week.

    Alternate Access:
    Use Creative Arts Building east entrance for Knuth and MeKenna as well as other classes.

    For More Information:
    415-338-1698
    build@sfsu.edu
    www.sfsu.edu/~build

    Replace Exterior Doors at Various Campus Buildings

    Posted:
    Monday, October 3, 2011 - 1:00 am

    Type:
    Exterior

    Effective:
    -

    Details:
    Project Description: This project will replace several exterior doors in various campus buildings. If the door has an automatic door operator, the door will receive a new door operator. Duration of work for each door is approximately 1week, 2 weeks if there is a door operator. Signage will be posted. Work begins later this week. The first two buildings affected are Burk Hall and Science. Location: Burk Hall main south entrance - Door operator disconnected on Thursday 10/06/11; work to start on Friday 10/07/11. Replacement of doors & automatic door operator Alternate Access: use adjacent doors. Location: Science near elevator Door operator disconnected on Friday 10/07/11; work to start on Saturday 10/08/11. Replacement of doors, automatic door operator & card key Alternate Access: use path between Science and Hensill and entrance with door operator. Future updates will announce upcoming affected building entrances.

    Alternate Access:
    As noted above.

    For More Information:
    415-338-1698
    build@sfsu.edu
    www.sfsu.edu/~build

    Fine Arts Lower Level Power Door

    Posted:
    Friday, September 16, 2011 - 1:00 am

    Type:
    Exterior

    Effective:
    -

    Details:
    The power door (entrance/outside) operator to the double doors at the lower level of the Fine Arts Building is not operational. Maintenance/repair is pending.

    Alternate Access:
    The accessible (non-power) doorway adjacent to the power doors is operational. Power doors at the south west and north west sides of the building are operational.

    For More Information:
    338-2472

    Update: Creative Arts Admin Office Elevator is Operational

    Posted:
    Wednesday, August 24, 2011 - 1:00 am

    Type:
    Exterior

    Effective:
    -

    Details:
    The elevator adjacent to McKenna Theater at the Creative Arts Building has been returned to service.

    Alternate Access:

    UPDATE Pathway 19th along Southside of Quad is OPEN

    Posted:
    Monday, August 15, 2011 - 1:00 am

    Type:
    Exterior

    Effective:
    -

    Details:
    The construction fences have been moved allowing passage from Library entry plaza from 19th Ave to the Cesar Chavez Student Center and Creative Arts Building. The new accessible path from 19th Ave along the south west side of the Quad is now open. Thank you - Capital Planning for creating this welcome entry to the campus.

    Alternate Access:

    Title: Creative Arts Admin Office, CA 255 Elevator repair

    Posted:
    Monday, August 8, 2011 - 1:00 am

    Type:
    Exterior

    Effective:
    -

    Details:
    The Creative Arts Building's exterior elevator at Holloway nearest to McKenna Theater of the be taken out of service on Tuesday, August 9, through September 16, 2011. This elevator provides access to Classroom CA 255 and the Academic Administrative Offices of the College of Creative Arts.

    Alternate Access:
    If you are unable to navigate the stairway to and from CA 255 please contact your Instructor for an alternative meeting room. If you need to meet with Creative Arts Administrative personnel and/or the Dean please phone 415-405-4281 to arrange an alternative meeting place. Staff should coordinate with their supervisors if alternative workplace needs to be arranged while the elevator undergoes repair. For additional assistance or information please contact the Creative Arts Technical Staff during business hours, phone 415-338-7758.

    For More Information:
    415-338-7758

    Parking Structure 20: Sky-walk and blue zone parking.

    Posted:
    Wednesday, August 3, 2011 - 1:00 am

    Type:
    Exterior

    Effective:
    -

    Details:
    Access to the Sky-walk leading from Parking Structure 20, rooftop parking level 19 to the newly graded walk and roadway to Five Corners will remain closed until August 15.

    Alternate Access:
    Temporary accessible parking has been designated behind the Gymnasium. Individuals requiring assistance in getting to campus from Lot 20 are urged to contact DPRC at (415) 338-2472 weekdays to arrange for shuttle service from 8:00 a.m. to 5:00 p.m. Afterwards and on weekends, call University Police at 415-338-7200 for assistance.

    For More Information:
    338-2472

    Intersection at Five Corners temporarily closed

    Posted:
    Friday, July 22, 2011 - 1:00 am

    Type:
    Exterior

    Effective:
    -

    Details:
    As part of the parking garage pathway re-grading project, the roadway intersection between the Student Services building and the Student Health Center will be temporarily closed. Pedestrian and motor traffic be advised.

    Alternate Access:
    Pedestrians going to and from the core of campus,the garage and, Library Annex buildings should use the pathway between the Village housing and the Student Services building. Traffic entering and exiting Lot 6 will use the service road east and north of Cox Stadium connecting to North State Drive. The service road will be one-way in both directions, with flaggers stationed at both ends to allow traffic to move alternately in each direction. Please see http://www.sfsu.edu/~build/images/base_map711_lot20.pdf for a map of the area and detours.

    SF City Sidewalk improvement:: Holloway at Arellano

    Posted:
    Thursday, July 21, 2011 - 1:00 am

    Type:
    Exterior

    Effective:
    -

    Details:
    City construction crews will be improving accessible curb to sidewalk access at the intersection of Holloway and Arrellano. Impacted will be two Blue Zone parking spaces located at the North side of Holloway. An alternate ramps on the same path of travel will be provided. Signs will be posted to direct the pedestrians.

    Alternate Access:
    Blue Zone parking spot will remain at the pedestrian crosswalk of Holloway and Cardeas. Alternate path at the intersection of Arellano and Holloway will be provided along the same rout. For direct information contact SF Dept of Public Works.

    For More Information:
    415- 554-8243

    Burke Hall Elevator C. closed for repair

    Posted:
    Wednesday, July 20, 2011 - 1:00 am

    Type:
    Interior

    Effective:
    -

    Details:
    Burke Hall Elevator C will undergo repairs on Wednesday - Friday. It may be available mid-day Friday. Elevator C is located in the West Wing of Burke Hall.

    Alternate Access:
    For alternative access to Burke Hall basement rooms 28 - 59 via the Service Ramp located across from the Student Health Center, please phone the DPRC during Office hours, 8:30 - 4:30 M/F. And for after hours service, please contact UPD 24 Hour Non-Emergency:(415)338-7200.

    For More Information:
    338-2472 TTY3382472

    Update: Library Entry Plaza from 19th Ave and Quad pathway

    Posted:
    Friday, July 8, 2011 - 1:00 am

    Type:
    Exterior

    Effective:
    -

    Details:
    Starting July 11, construction will begin on the new Library entry plaza and an accessible pathway to 19th Avenue. Pedestrian traffic will be re-routed to the Quad via the pathway/courtyard between the Business and HSS buildings. Fencing and detour signs will be in place. All adjoining buildings will remain open; however particular entry points may be affected. A map of the area can be found at the following link: http://sfsu.edu/~build/images/Library_plaza.pdf Every effort will be made to reopen the plaza and main pathway along the Quad by mid-August.

    Alternate Access:
    Accessible Rout along Holloway from 19th Ave. and, between Business and HSS will remain open. Individuals may contact the DPRC for Shuttle Service. DPRC Summer Office hours, 8:30 - 4:30 M/F. For after hour Shuttle and campus escort service, please contact UPD 24 Hour Non-Emergency:(415)338-7200.

    For More Information:
    405-338-1698
    build@sfsu.edu
    www.sfsu.edu/~build

    Primary Pathway Renovations

    Posted:
    Friday, July 8, 2011 - 1:00 am

    Type:
    Exterior

    Effective:
    -

    Details:
    The main pathway from 19th Avenue and Holloway Avenue going west past HSS between BUS and the Library project site fence has been partially blocked by a construction fence. This fencing is required for renovation of the plaza and main campus pathway in this area. Please follow posted directional signage for safe passage on to the Quad.

    Alternate Access:
    Alternate routes include taking either the pathway immediately west of Lot #2 south to Holloway Avenue and then west to the ramp east of Creative Arts which then re-enters the campus, or the pathway between HSS and BUS northerly to the pathway between BUS and SCI west onto the Quad.

    For More Information:
    415-338-1698
    build@sfsu.edu
    www.sfsu.edu/~build

    Main Campus Pathway Renovations Trigger Use of Alternate Accessible Routes

    Posted:
    Monday, June 27, 2011 - 1:00 am

    Type:
    Exterior

    Effective:
    -

    Details:
    The main pathway from 19th Avenue and Holloway Avenune heading west past HSS between BUS and the Library Project site will be completely blocked by a construction fence beginning July 11, 2011 and lasting through August 15, 2011. This is necessary for renovation of the plaza and main campus pathway in this area. Please make use of the suggested alternate access described below.

    Alternate Access:
    Alternate routes include taking either the pathway immediately west of Lot #2 south to Holloway Avenue and then west to the ramp east of Creative Arts which then re-enters the campus, or the pathway between HSS and BUS northerly to the pathway between BUS and SCI west onto the Quad.

    For More Information:
    45-338-1698
    build@sfsu.edu
    www.sfsu.edu/~build

    Parking Structure Lot 19 and 20: Elevator is Operational

    Posted:
    Thursday, June 9, 2011 - 1:00 am

    Type:
    Exterior

    Effective:
    -

    Details:
    Parking Structure 20 Elevator of is up and running.

    Alternate Access:
    For for pedestrian paths to campus, please follow signage that is provided at the entrance/exit of Parking Level 2 and in rout to and from campus. For for Shuttle Service to and from Lot 20, individuals may contact the DPRC from 8:30 am - 4:30 pm, M/F; phone, 415 338-2472. After-hours 4:30 - 11:pm Monday/Saturday shuttle and escort, please contact UPD 24 Hour Non-Emergency; phone, 415-338-7200. Shuttle cart rides may be scheduled in advance or requested by telephone as needed. Detailed information on alternate routes during construction is available at http://sfsu.edu/~build/images/lot20_1100404_CTv2.pdf

    For More Information:
    338-2472 or 338-7200

    Parking Structure Lot 20/19: Elevator Maintenance and Repair

    Posted:
    Tuesday, June 7, 2011 - 1:00 am

    Type:
    Exterior

    Effective:
    -

    Details:
    The elevator at parking structure Lot 20 and 19 will be down for an indeterminate time due to environmental anomalies. Repair and maintenance is underway. Announcement of operational date will be posted as soon as possible.

    Alternate Access:
    Please park on level 2 (parking structure entrance level) or Blue zone Handicapped Packard parking in lot 6 behind the Gym. For accessible shuttle service and escort from 8:30 am -4:30 pm M-F, contact DPRC at 415 338-2472. For escort outside of these hours, please contact Public Safety at 415 338-2472.

    For More Information:
    338-2472 or 338 2472

    HSS Elevator Out of Service

    Posted:
    Wednesday, June 1, 2011 - 1:00 am

    Type:
    Interior

    Effective:
    -

    Details:
    The elevator in the HSS building is currently out of service and will not be available for the remainder of the day. Contact Facilities at (415)338-1568 for assistance before 5 pm. After 5 pm, or in the event of an emergency, contact the University Police Department at (415)338-7200.

    Alternate Access:
    For More Information:
    415-338-6148
    sslai@sfsu.edu

    Lot #20 Accessible Parking

    Posted:
    Thursday, May 19, 2011 - 1:00 am

    Type:
    Exterior

    Effective:
    -

    Details:
    As of Monday, May 23, 2011 accessible parking on the 5th level of Lot #20 will not be available due to reconstruction of the pedestrian bridge connecting the parking garage to the campus. These parking spaces will be returned to use by mid-July, 2011 when a new wider bridge and accessible path to campus will be in place

    Alternate Access:
    Lot #6, located behind the Gymnasium 11 accessible parking places, 6 of which are covered. Additionally, across from these spaces are 8 accessible spaces which will also be available. Vehicular traffic exiting Lot 6 will be re-routed to North State Drive via the service road west of Cox Stadium. Signs will be clearly posted, but please be prepared to take a sharp right turn. Individuals may contact the DPRC for Shuttle Service to and from Lot 6; DPRC Summer Office hours, 8:30 - 4:30 M/F. Contact UPD after hour Shuttle and campus escort service. Detailed information on alternate routes during construction is available at http://sfsu.edu/~build/images/lot20_1100404_CTv2.pdf

    For More Information:
    415-338-1698
    build@sfsu.edu
    www.sfsu.edu/~build

    Admin elevator, scheduled maintenance: SW corner of Old Building

    Posted:
    Friday, May 6, 2011 - 1:00 am

    Type:
    Exterior

    Effective:
    -

    Details:
    Thursday, May 26, 2011 and Friday, May 27, 2011 scheduled maintenance and repairs on ADM Elevator No. 4; this is the elevator facing the Library at the southwest corner of Old Administration Building.

    Alternate Access:
    Please use the elevator located in the 'breezeway' between Old and New Administration Buildings.

    For More Information:
    415-338-1864

    Elevator Parking Structure 20 & 19 Closed till 3PM

    Posted:
    Monday, May 2, 2011 - 1:00 am

    Type:
    Exterior

    Effective:


    Details:
    Parking Structure 20 Elevator will undergo maintenance and repair Closed till 3PM.

    Alternate Access:
    Accessible parking is directed to the roof aka. lot 19. Access to campus via the Sky-walk.

    For More Information:
    405-3628

    Elevator maintenance Parking Lot Structure 20 and 19

    Posted:
    Thursday, April 28, 2011 - 1:00 am

    Type:
    Exterior

    Effective:


    Details:
    On April 29 2011, from 10AM through 2pm the Parking Lot Structure 20 and 19 elevator will undergo on maintenance. During this time the elevator will be closed.

    Alternate Access:
    Accessible parking can be found on the roof. Please use the sky walk to campus.

    For More Information:
    1 415 338 2472

    The west entrance exit of the Humanities Building, closed April 21

    Posted:
    Wednesday, April 20, 2011 - 1:00 am

    Type:
    Exterior

    Effective:
    -

    Details:
    The west entrance, exit of the Humanities Building, facing the School of the Art,) will be closed on Thursday, April 21, 2011 to permit replacement of the approaching asphalt walkway. This work is associated with the Phase 1A Utilities project. All other entrances, exits will be open and available for use. The west exit will be available for emergency exiting at all times.

    Alternate Access:
    All other entrances / exits will be open and available for use. The west exit will be available for emergency exiting at all times.

    For More Information:
    338-2472