Alerts


List of past alerts
Alerts Effective Dates
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-

    Science building passenger elevator out of service

    Posted:
    Wednesday, October 25, 2006 - 1:00 am

    Type:
    Exterior

    Effective:
    -

    Details:
    The passenger elevator in the Science building is out of service for emergency repairs. The doors and associated hardware were damaged. It is not known at this time how long the elevator will be out of service until Monday, 10/30/06.

    Alternate Access:
    For alternate access the freight elevator may be used, for access to the 1st and 2nd floors. Assistance will be required as the freight elevator is not ADA accessible. For access to the 3rd floor please contact your supervisor or department head.

    For More Information:
    415-405-3628
    mfcurran@sfsu.edu

    Science elevator out of service

    Posted:
    Thursday, August 31, 2006 - 1:00 am

    Type:
    Interior

    Effective:
    -

    Details:
    The Science building passenger elevator is out of service for emergency repairs. The service disruption will last until at least mid morning tomorrow Friday, 9/1/06.

    Alternate Access:
    The alternate route for the first and second floor would be the freight elevator with assistance. For access to the third floor see your department manager.

    For More Information:
    415-405-3628
    mfcurran@sfsu.edu

    Fine Arts --Creative Arts pathway construction

    Posted:
    Wednesday, August 23, 2006 - 1:00 am

    Type:
    Exterior

    Effective:
    -

    Details:
    Repairs are being made to the pathway between Fine Arts and Creative Arts. As a result the pathway, and the Creative Arts entrance in the area and the Cinema ramp to Fine Arts are all obstructed.

    Alternate Access:
    The alternate pathway is between Fine Arts and Burk Hall. For building access use the other ADA entrances the the buildings.

    For More Information:
    415-405-3628
    mfcurran@sfsu.edu

    Lot 20 elevator out of service

    Posted:
    Wednesday, August 23, 2006 - 1:00 am

    Type:
    Interior

    Effective:
    -

    Details:
    The Lot 20 parking garage elevator is out of service for emergency repairs until approximately 12:00pm on Thursday, 8/24/2006.

    Alternate Access:
    The ADA alternate route is to use to the ADA parking on the roof of the garage.

    For More Information:
    415-405-3628
    mfcurran@sfsu.edu

    Sidewalk on Font in front of Mary Ward Hall, and between Mary Ward and Mary Park Halls

    Posted:
    Wednesday, August 23, 2006 - 1:00 am

    Type:
    Exterior

    Effective:
    -

    Details:
    Due to repairs being made to a broken gas main, the sidewalks on Font in front of Mary Ward Hall, and between Mary Ward Hall and Mary Park Hall are obstructed.

    Alternate Access:
    From Font, detour between The Child Care Center and Mary Park Hall and stay between Seven Hills Center and Mary Ward Hall as you proceed to campus.

    For More Information:
    415-405-3628
    mfcurran@sfsu.edu

    Science building passenger elevator out of service

    Posted:
    Monday, August 21, 2006 - 1:00 am

    Type:
    Interior

    Effective:
    -

    Details:
    The Science building passenger elevator will be out of service from today, Monday, 8/21/2006 through Wednesday, 8/23/2006, for emergency replacement of a valve.

    Alternate Access:
    The alternate route for the first and second floor would be the freight elevator with assistance. For access to the third floor see your department manager.

    For More Information:
    415-405-3628
    mfcurran@sfsu.edu

    ADA Sliding Doors - HSS Building

    Posted:
    Tuesday, August 15, 2006 - 1:00 am

    Type:
    Exterior

    Effective:
    -

    Details:
    Existing HSS South West doors will be removed and replaced with new electric operating ADA Sliding Doors on Wednesday, August 16, 2006. Doors will be down for 1 day.

    Alternate Access:
    The Alternative entrance doors are the HSS South Center doors on the Ground Floor just east of the present HSS South West doors.

    For More Information:
    415-405-3628
    mfcurran@sfsu.edu

    Sidewalk repairs north side of Humanities building

    Posted:
    Tuesday, August 15, 2006 - 1:00 am

    Type:
    Exterior

    Effective:
    -

    Details:
    Beginning Wednesday 8/16/2006 through Friday 8/18/2006 the sidewalk on the north side of Humanities, between Humanities and the Student Services building, will be closed for repairs.

    Alternate Access:
    The alternate way would be the proceed along the sidewalk on the north side of the Student Services building, or go through the Humanities building, west to east.

    For More Information:
    415-405-3628
    mfcurran@sfsu.edu

    ADA Paving Improvements Towers at Centennial Square

    Posted:
    Tuesday, July 11, 2006 - 1:00 am

    Type:
    Exterior

    Effective:
    -

    Details:
    Existing crosswalk and vehicular driveway on State Drive at the Towers across from Parking Lot 20 will be removed, with vehicle access to dock and gate retained over packed gravel.

    Alternate Access:
    Pedestrian access to Parking Lot 19/20 will be via pathway on South side of Towers to the 5th floor pedestrian bridge and parking lot elevator.

    For More Information:
    415-405-3628
    mfcurran@sfsu.edu

    ADA Paving Improvements Thornton Hall

    Posted:
    Tuesday, July 11, 2006 - 1:00 am

    Type:
    Exterior

    Effective:
    -

    Details:
    Existing driveway next to portable T-N, and sidewalk curbs and gutter north of Thornton Hall will be removed. Access ramps at Portables T-H, T-J and T-N are closed through the construction site.

    Alternate Access:
    ]>

    For More Information:
    415-405-3628
    mfcurran@sfsu.edu

    ADA Paving Improvements HSS/BUS Pathway

    Posted:
    Tuesday, July 11, 2006 - 1:00 am

    Type:
    Exterior

    Effective:
    -

    Details:
    HSS/BUS: Existing concrete courtyard ramps and asphalt pathway between HSS and BUS buildings are being removed and replaced.

    Alternate Access:
    Enter HSS or BUS on the south side, facing Administration

    For More Information:
    415-405-3628
    mfcurran@sfsu.edu

    ADA paving improvements Business, Thornton, Conference Center,

    Posted:
    Monday, July 10, 2006 - 1:00 am

    Type:
    Exterior

    Effective:
    -

    Details:
    The work will include removal and replacement of the pathway between Business and HSS, and also the steps and ramps from Business to the HSS courtyard. In addition the curb cut at the north end of Thornton Hall will be removed and replaced, and portions of the sidewalk between the Towers conference center and Lot 20 will be replaced.

    Alternate Access:
    Accessible routes to HSS and Business will not be obstructed. Accessible route to the Trailers behind Hensill Hall is still available from the Thornton loading dock. Accessible route to Lot 20 and campus from the Towers conference center is from the pathway on the south side of the Towers

    For More Information:
    415-405-3628
    mfcurran@sfsu.edu

    BUSINESS elevator out of service for emergency repair

    Posted:
    Friday, July 7, 2006 - 1:00 am

    Type:
    Interior

    Effective:


    Details:
    The Business building elevator is out of service for emergency repair. I anticipate that the service will be restored later today, Friday, 7/7/2006. For alternative access please contact your department head.

    Alternate Access:
    For alternative access please contact your department head.

    For More Information:
    415-405-3628
    mfcurran@sfsu.edu

    Parking Garage Lot 20 elevator out of service

    Posted:
    Wednesday, April 19, 2006 - 1:00 am

    Type:
    Parking

    Effective:
    -

    Details:
    The Parking Garage Lot 20 elevator is out of service for emergency repairs. It is anticipated that it will be returned to service by Monday 4/24/06. Anyone requiring ADA access parking should park on the roof level of the garage, as I am advised that there are an adequate number of ADA parking spaces on the roof level.

    Alternate Access:
    Park on roof level.

    For More Information:
    415-405-3628
    mfcurran@sfsu.edu

    Science building elevator

    Posted:
    Monday, September 19, 2005 - 1:00 am

    Type:
    Exterior

    Effective:


    Details:
    The elevator in the Science building is down for emergency repairs. At this time it is expected to take the remainder of today (9/19/2005) to complete the repairs and return the elevator to service.

    Alternate Access:
    The freight elevator serves the first and second floor, but is not ADA certified. A person in a wheel chair could use this elevator with assistance. For access to the third floor, please contact your department head for further information/assistance.

    For More Information:
    415-405-3628
    mfcurran@sfsu.edu

    Pathway Between Hensill Hall and Science Closed

    Posted:
    Monday, June 6, 2005 - 1:00 am

    Type:
    Exterior

    Effective:
    -

    Details:
    As a result of the exterior repainting of the Science Building and the Business Building over the summer it will be necessary to close pathways adjacent to these buildings on an as-needed basis. Accessible entrances to the south side of the Science Bldg. and the north end of the Business Building will be maintained throughout the course of the project. Barricades and other signage will signal construction areas. We apologize for the inconvenience.

    Alternate Access:
    Currently the 19th Ave. pathway between Hensill Hall and the Science Building is closed. Users are asked to travel through Hensill Hall, using the elevator from the street level (3rd floor) to the 2nd level exit and ramp near Thornton.

    For More Information:
    (415) 338-2720
    twill@sfsu.edu

    Construction Work on Manholes along Pathways - Areas Fenced Off

    Posted:
    Friday, June 3, 2005 - 1:00 am

    Type:
    Exterior

    Effective:
    -

    Details:
    As part of the Technology Infrastructure Services (TIS)project, pedestrians are asked to be aware of work on campus manholes on campus pathways throughout the month of June. The construction area will be approximately 5 feet in diameter, and will be marked with a circular yellow and orange fence. Manhole locations being worked: Two between the Student Center and the Quad; two between the Administration Building and HSS Bldg; one northwest of the Library; and one between Thornton & Science.

    Alternate Access:
    For More Information:
    (415) 405-3812
    jodatian@sfsu.edu

    Business elevator out of service

    Posted:
    Monday, March 14, 2005 - 12:00 am

    Type:
    Interior

    Effective:
    -

    Details:
    The elevator in the Business building is out of service for emergency repairs. It is anticipated that the elevator will be out of service through Tuesday, 3/15/05.

    Alternate Access:
    No other elevator service to floors 2 thru 5, contact your department head.

    For More Information:
    415-405-3628
    mfcurran@sfsu.edu

    Ethnic Studies--Psychology building elevator

    Posted:
    Friday, January 21, 2005 - 12:00 am

    Type:
    Interior

    Effective:


    Details:
    The ETH-PSY building elevator will be out of service on Monday, 1/24/05, from 8:00 AM until 5:00 PM for unscheduled maintenance.

    Alternate Access:
    There no alternate ADA access to the 2nd thru 5th floors. Contact your department head concerning accommodation.

    For More Information:
    415-405-3628
    mfcurran@sfsu.edu

    Pathway between Burk Hall and Fine Arts

    Posted:
    Tuesday, January 18, 2005 - 12:00 am

    Type:
    Exterior

    Effective:
    -

    Details:
    The pathway between Burk Hall and Fine Arts is partially obstructed by contractors making ADA modifications to the pathway. The weather is delaying the completion of the work.

    Alternate Access:
    Pathway between Fine Arts and Craetive Arts OR the pathway between Burk Hall and the Gym.

    For More Information:
    415-405-3628
    mfcurran@sfsu.edu

    Science building elevator out of service

    Posted:
    Tuesday, January 18, 2005 - 12:00 am

    Type:
    Interior

    Effective:
    -

    Details:
    The elevator in the Science building is out of service for emergency repairs. The exact duration of this outage is not know at this time however, I will update you when I have that information.

    Alternate Access:
    There is an alternate ADA access from the 1st floor to the 2nd floor using the freight elevator. A person with a disability would require assistance in using this elevator. There is no alternate access to the 3rd floor.

    For More Information:
    415-405-3628
    mfcurran@sfsu.edu

    HSS ADA entrance southwest corner closed

    Posted:
    Thursday, January 13, 2005 - 12:00 am

    Type:
    Exterior

    Effective:


    Details:
    The ADA entrance on the southwest corner of the HSS building will be closed on Friday, 1/14/05, from 7:00AM until 5:00PM while the glass is being replaced.

    Alternate Access:
    Use the ADA entrance on the 19th Avenue side of the building.

    For More Information:
    415-405-3628
    mfcurran@sfsu.edu

    Ethnic Studies and Psychology building elevator

    Posted:
    Wednesday, January 12, 2005 - 12:00 am

    Type:
    Interior

    Effective:
    -

    Details:
    The Ethnic Studies & Psychology building elevator will be out of service from 8AM until 5PM on Thursday, 1/13/05 for emergency repairs. If you have any questions or concerns please contact me.

    Alternate Access:
    There are no alternate ADA means of accessing floors 2-5.

    For More Information:
    415-405-3628
    mfcurran@sfsu.edu

    Painting exteriors of Residence Dining, Ward Hall, and Park Hall

    Posted:
    Friday, October 29, 2004 - 1:00 am

    Type:
    Exterior

    Effective:
    -

    Details:
    Painting the exteriors of the Residence Dining Center, Ward Hall, and Park Hall. The scope of work also includes pressure washing the brick surfaces of the buildings. The Contractor's work hours are 7:00 a.m. to 4:00 p.m. Entrances and exits to the buildings may be blocked while work is in progress overhead; signs and barricades will direct people to alternate entrances/exits. Residents and passersby may notice the odor of the urethane product and some noise from the equipment, especially the pressure washers, power rollers, and the tools used to install lag bolts for the scaffolding.

    Alternate Access:
    Wheelchair access to the Housing Office will be via the Font Boulevard sidewalk rather than via the ramp at the Village end of Mary Ward Hall while scaffolding is up for the painting project.

    For More Information:
    87089 or 82720
    syuki@sfsu.edu or twill@sfsu.edu

    Fine Arts Building Access Restricted

    Posted:
    Friday, September 17, 2004 - 1:00 am

    Type:
    Exterior

    Effective:
    -

    Details:
    Pathway between Fine Arts and Burk Hall will be intermittently closed to allow for dismantling and removal of scaffolding materials.

    Alternate Access:
    The pathway between the Health Center and Burk Hall leads to an accessible Burk Hall entrance on the building's east side and provides access to the inner campus from the west. The pathway between Fine Arts and Creative Arts leads to Fine Arts' accessible entrances located on the south side (1st floor level) and the east side (5-story wing).

    For More Information:
    (415) 338-7242
    dmccormi@sfsu.edu